Similar Projects
Baptist Health Emergency Room Expansion - Van Buren
Addition, Infrastructure
Conception
$10,000,000 CJ est. value
Van Buren, AR 72956

8th Street Commercial Buildings
New Construction, Infrastructure
Conception
$5,800,000 CJ est. value
Rogers, AR 72758

Sultana Museum and Interpretive Exhibits
Renovation, Infrastructure - 23,000 SF
Design
$400,000 CJ est. value
Marion, AR 72364

K-Life Of Hot Springs
New Construction, Infrastructure - 3,000 SF
Design
$981,000 CJ est. value
Hot Springs, AR 71913

Pickens to Dumas Waterline
Infrastructure
Bidding
$325,000 CJ est. value
Dumas, AR 71639

Branch Overlay and Surfacing (S)
Infrastructure
Bidding
$4,000,000 CJ est. value
Ozark, AR 72949

Indoor Sports Complex Cabot
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Cabot, AR 72023

Runway 18-36 Widening
Infrastructure
Post-Bid
$2,600,000 CJ est. value
Bentonville, AR 72712

Lakeside Middle School Cafeteria and ADA Toilet Addition
Addition, Demolition, Renovation, Infrastructure - 4,545 SF
Results
Lake Village, AR 71653

Airfield Pavement Rehabilitation
Infrastructure
Results
$59,125 CJ est. value
Horseshoe Bend, AR 72512

Andy's Frozen Custard / Bentonville
New Construction, Infrastructure - 3,000 SF
Construction
$850,000 CJ est. value
Bentonville, AR 72712

Lagoon and Pump Station Rehabilitation Rebid
Renovation, Infrastructure
Construction
$200,000 CJ est. value
Montrose, AR 71658

Hogan Lane Absolute Storage
New Construction, Infrastructure - 50,000 SF
Pending Verification
$4,000,000 CJ est. value
Conway, AR 72034

Superior Storage
New Construction, Infrastructure - 25,287 SF
Pending Verification
$2,000,000 CJ est. value
Rogers, AR 72758

Twenty-Second Street Business Park
New Construction, Infrastructure - 20,312 SF
Conception
$3,300,000 CJ est. value
Rogers, AR 72756

Last Updated 05/16/2023 02:12 PM
Project Title

Entergy Arkansas Driver Solar Project - The Arkansas Public Service Commission

Physical Address View project details and contacts
City, State (County) Osceola, AR 72370   (Mississippi County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Power Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.saurenergy.com/solar-energy-news/lightsource-bp-closes-financing-starts-construction-on-250-mw-us-solar-project Updated On Wed, Apr 12th, 2023 Lightsource bp has closed on a $327 million financing package and mobilized construction on the 313 ... Lightsource bp said in its statement that upon completion, at 313 MW Driver Solar will be the larges... Construction has started with commercial operation expected by late 2024. Moss Construction was sele... Laura Landreaux, president and CEO of Entergy Arkansas, said that the Driver Solar is the result of ... Located adjacent to both US Steel's Big River Steel facility and their recently announced $3 billion... Over the last four years, the Lightsource bp has raised over $3.7 billion in financing for projects ... Once constructed, ownership of the project will transfer to Entergy Arkansas under the build-transfe... ______________________________________________________________________________________________________________________ Plans call for a a new 250-megawatt AC (or or 312-megawatt DC) renewable energy plant) on 2,100 acres outside Osceola. As of October 14, 2022, this is a 50/50 partnership between Lightsource BP and British Petroleum. Information regarding a design team and a general contractor is not available. A timeline for construction has not been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents