Similar Projects
Big River Regional Trail Mendota Trailhead
Bidding
$1,400,000 est. value
Mendota Heights, MN 55120

2021 Micro Surfacing
Bidding
$450,000 est. value
Apple Valley, MN

Century Middle School Pool Addition - Bid Package 4 - Parking Lot
Post-Bid
Lakeville, MN 55044

2021 Crack Sealing and Seal Coating
Post-Bid
MN

CSAH 42/Akron Avenue Intersection Improvements
Results
Less than $2,700,000 est. value
Hastings, MN 55033

Grading, Bituminous Mill and Overlay
Results

Greenleaf Elementary Galaxie Pedestrian Crossing
Bidding
$406,458 est. value
Apple Valley, MN 55124

Steve Michaud and Rolling Oaks Parks Parking Lot and Trail Improvements
Post-Bid
$625,000 est. value
Lakeville, MN 55044

Lift Station No. 1 & Lift Station No. 2 & Forcemain No. 2 Improvements
Results
$4,000,000 to $4,200,000 est. value
West Saint Paul, MN

Cliff Road Trail 13 to Eagan
Bidding
$1,000,000 to $1,500,000 est. value
Eagan, MN 55123

2021 Trail Sealcoat
Post-Bid
Belle Plaine, Eagan, Elko, Jordan, New Market, Prior Lake, Savage, Waconia, MN

Metro-Wide Traffic Control and Flood Sealing for Bridge Numbers 19095, 27624G, 27210, 9195, 27078, 27V59, 27517, 27526, 27654, 27265, 27R21, 9860, and 82527
Results

Downtown M&O and General Sidewalk
Term Contract
Bidding
Saint Paul, MN

2021 Reclamite Application
Post-Bid
West Saint Paul, MN 55118

Grading, Bituminous Surfacing, Signing, TMS, and Lighting
Results

Last Updated 03/23/2021 01:29 PM
Project Title

2021 Maintenance Overlay Highland Forest Area

Physical Address View project details and contacts
City, State (County) Burnsville, MN   (Dakota County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the making of the following described local improvements, said proposal for the furnishing of all labor and materials for the construction, complete in place of the following approximate quantities: 3,200 CY Salvage Aggregate to and from Stockpile 7,000 CY Common and Subgrade Excavation 3,750 TON Bituminous Paving 6,700 LF Curb and Gutter Replacement 2,100 SF Concrete Sidewalk and Pedestrian Ramp Replacement 5,000 SY Turf Restoration 250 LF Storm Sewer 4,500 LF Water Main Replacement 270 LF Sanitary Sewer Lining

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents