Similar Projects
Z--Improve Drainfield
Design
$500,000 to $1,000,000 est. value
SC 29412

Gravity Sewer Greenlawn Drive to Burnside 1 Pump Station Phase 2 (SS7258) CDBE
Infrastructure
Bidding
Columbia, SC

Gravity Sewer Extension along Pisgah Church Road
Infrastructure
Bidding
Lexington, SC 29072

Manhole Repair
Post-Bid
Irmo, SC 29063

Spring Forest Drive Emergency Replacement Project
Post-Bid
Central, SC 29630

Mary Black Hospital Interceptor Basin - Sewer System Evaluation Study
Results
Spartanburg, SC

Antioch Branch Sewer Extension Project
Results
Less than $1,300,000 est. value
Greenville, SC

On-Call Septic Tank Repair Services
Term Contract
Bidding
Spartanburg, SC

Grease Trap and Septic Tank Pumping Services
Post-Bid
Greenwood, SC 29648

SC Data Center - UST Pump Housing/Vault Replacement and Waterproofing
Results
$125,000 to $135,000 est. value
Columbia, SC

Venture Park Water and Wastewater Improvements
Infrastructure
Bidding
SC

Sewer Operations and Maintenance Services
Post-Bid
Ravenel, SC 29470

Utility Relocations - North Lee Street and Livingston Lane Sewer Lines
Results
Batesburg, SC

Historic District Sewer Phase 2 (Bridge Street Extension)
Infrastructure
Bidding
Bluffton, SC 29910

Grease Trap Service
Term Contract
Post-Bid
Charleston, SC

Reported 07/23/2021 12:00 AM
Project Title

Clinton Mills Sewer Rehabilitation Phase I

Physical Address View project details and contacts
City, State (County) Clinton, SC   (Laurens County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of furnishing all materials, equipment and labor necessary to construct Clinton Mills Sewer Rehabilitation Phase I, consisting of the following approximate quantities: 3,255 LF of 8-inch gravity sewer rehabilitated by CIPP, 65 LF of 10-inch gravity sewer rehabilitated by CIPP, 120 LF of 12-inch gravity sewer rehabilitated by CIPP, 4,415 LF of 8-inch gravity sewer rehabilitated by pipe bursting, 1,095 LF of 10-inch gravity sewer rehabilitated by pipe bursting, 845 LF of 12-inch gravity sewer rehabilitated by pipe bursting, 43 manholes to be rehabilitated, 7 new manholes, 19 point repairs of 10 LF or less, 5 LF of point repairs greater than 10 LF, rehabilitation of associated service laterals, service lateral reconnections, cleanout installations, milling, asphalt, curb and gutter, and sidewalk replacement.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents