Similar Projects
Boiler Replacement
Renovation, Alteration
Bidding
Ottawa, IL 61350

HVAC and Boiler Replacement
Alteration
Bidding
$400,000 est. value
Buncombe, IL 62912

Water Heater Replacement - Tech Building
Post-Bid
Ford Heights, IL 60411

York High School MEP Upgrades
Post-Bid
Elmhurst, IL 60126

Boiler Blowdown Header Replacement
Results
Winnetka, IL

Rehabilitate Hot Water Distribution System -General
Results
Less than $1,500,000 est. value
Danville, IL 61834

SRE/ARFF Building at Decatur Airport
New Construction
Construction
Decatur, IL 62521

New Simpson Hill HVAC Improvements - Phase 1
Renovation, Infrastructure
Bidding
$300,000 est. value
Ozark, IL 62972

D97 Lincoln Elementary Boiler Replacement
Post-Bid
Oak Park, IL 60304

Manual High School Pool Filtration System
Results
Peoria, IL 61605

Replace Boilers, Pumps and Condensing Units - Southeastern Illinois College
Alteration
Bidding
$800,000 est. value
Cicero, IL 60804

Boiler Replacements
Post-Bid
Moline, IL 61265

Boiler Replacement
Results
Elgin, IL 60123

Weatherization Services- Mechanical
Alteration
Bidding
$250,000 est. value
Rockford, IL

BRL MEP Upgrades - Division 01
Renovation
Post-Bid
Chicago, IL 60612

Reported 06/04/2022 12:00 AM
Project Title

Boiler Replacement Project at Middle / High School - BP 23A Mechanical Work

Physical Address View project details and contacts
City, State (County) Hebron, IL   (McHenry County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids. Construction Manager to Subcontract.
Project Status Sub-Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Gilbane Building Company, Construction Manager, for and acting on behalf of The Board of Education of Alden Hebron Community School District 19, is receiving lump sum proposals from interested contractors for the Alden Hebron CSD 19 Boiler Replacement Project. The school is looking to perform a boiler replacement project at the Middle / High School. This work shall include removing and replacing (2) existing boilers, including associated equipment, temperature controls, power, etc. The architect for this project is Wold Architects & Engineers. BP Description BP 23A Mechanical Work To bid this project, bidders must be qualified by Gilbane Building Company. The prequalification application is to be completed Electronically. Questions regarding the prequalification application procedure should be directed to Yvonda Royster at 312-614-3913 or yroyster@gilbaneco.com. Bid security in the form of a bid bond in an amount equal to ten percent (10%) of the base bid is required from all bidders. Guarantee Bonds in the form of a Performance Bond and Labor and Material Payment Bond in an amount equal to one hundred percent (100%) of the bid will be required from the awarded Bidder. The work will be done in accordance with the Contract Documents. "Failure to Comply With the Requirements of This Invitation to Bid May Result in the Disqualification of the Bidder". This contract calls for the construction of a "public work," within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. ("the Act"). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the "prevailing rate of wages" (hourly cash wages plus fringe benefits) in the county where the work is performed. All contractors and subcontractors rendering services under this contract must comply with all requirements of the Act, including but not limited to, all wage, notice and record keeping duties. The Board of Education of Alden Hebron Community School District 19 and Gilbane Building Company reserve the right to reject any or all bids. All information submitted as part of this process shall be considered public information under the State Freedom of Information Act unless specifically disclosed on the applicable information by the Bidder.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents