Similar Projects
Last Updated | 03/10/2023 10:02 AM |
Project Title | Richmond Dam Spillway Replacement |
Physical Address | View project details and contacts |
City, State (County) | Aberdeen, SD 57401 (Brown County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel, Site Development |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Request for Qualifications, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,500,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of March 10, 2023, an engineer has been selected for the project. Although a firm timeline for construction has not been determined, construction is not expected to start prior to June of 2023. *The closed solicitation has been included below for reference: The State is looking for firms interested in providing professional Engineering services for the project referenced above. The project scope will involve the design, bid and construction for Richmond Dam Spillway Replacement for the Office of School and Public Lands in Aberdeen, South Dakota, OSE # ASW23--02X. This project will replace the spillway and address seepage through the dam grade. . The project will need to be designed and ready for bid advertisement by May 2023. Construction is anticipated to occur June 2023 to December 2023. Firms desiring to be considered for providing professional services for this project should send a statement of interest that outlines qualifications and experience for this project. Statements of Interest should at a minimum include the following: 1. Specialized expertise, capabilities, and technical competence as demonstrated by the team's capabilities, proposed approach and methodology to meet the project requirements. (30%) 2. Resources available to perform the work, including any specialized services, within the specified time limits for the project. Include resumes of all personnel, including sub-consultants who will be assigned to this project for the entire duration. (25%) 3. Record of past performance, including price and cost data from previous projects, quality of work, ability to meet schedules, cost control, and contract administration. (15%) 4. Availability to project locale. (5%) 5. Familiarity with project locale. (5%) 6. Proposed project management techniques. (10%) 7. Ability and project history in handling special project constraints. (10%) A technical review committee will select the firm based on the criteria shown. The committee respectfully requests that statements of interest be limited to 15 pages or less. This is not a requirement; merely a request. The method of contractor selection has not been determined at this time. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |