Similar Projects
Butterfly Valves and Actuators
Infrastructure
Bidding
Lakewood Ranch, FL

Oxford Drive Water Main and Drainage Improvements
Post-Bid
Bradenton, FL 34205

Riverview Boulevard Water Main Improvements
Infrastructure
Post-Bid
Bradenton, FL 34204

Paradise Bay Watermain Replacement
Results
FL

Fogarty Subdivision Water Main Replacement
Results
FL

7th Street Extension
Infrastructure
Post-Bid
$1,500,000 to $1,075,000 est. value
Palmetto, FL 34221

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Cooling Tower Piping Improvements and Site Hw Underground Piping Improvements
Infrastructure
Post-Bid
Bradenton, FL 34204

Cortez Gardens Subdivision Water Main Replacement
Results
FL

Erie Road - US 301 to US 301 South-North Phase II
Results
FL

Water Treatment Services
Results
Bradenton, FL

Meter Testing Calibrations and Repairs
Results
FL

G.T. Bray Drainage Pipe Cure-In-Place Pipe (CIPP) Lining Project
Infrastructure
Results
Bradenton, FL 34209

Force Main 33A and 36A Replacements
Infrastructure
Results
Bradenton, FL

Medalist Road Watermain Replacement
Infrastructure
Results
$335,707 est. value
Sarasota, FL 34243

Reported 06/25/2022 12:00 AM
Project Title

Regional Integrated Loop Phase 2B and Phase 3C Pipelines

Physical Address View project details and contacts
City, State (County) Myakka City, FL   (Manatee County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected February 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Providing the design, permitting, and construction of the Regional Integrated Loop Phases 2B and Phase 3C Pipelines ("Projects"). The Projects include services for the design, permitting and construction of large diameter potable water transmission mains to meet deadlines shown in the Performance Criteria on the Phase 2B pipeline for Charlotte County and Phase 3C pipeline for Sarasota County

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents