Similar Projects
Lealman Heights Redevelopment
New Construction
Conception
Saint Petersburg, FL 33714

Tyson Avenue Mixed Use Development
New Construction - 32 SF
Conception
$237,300,000 est. value
Tampa, FL 33611

Lamplight Village Redevelopment
New Construction
Design
Saint Petersburg, FL 33702

Gateway Project - Artisan East Apartments
New Construction - 17,200 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Dunedin, FL 33755

Seminole Square Apartments
New Construction, Infrastructure - 97,955 SF
Bidding
$13,000,000 CJ est. value
Largo, FL 33778

Seminole Square Apartments
New Construction, Infrastructure - 97,955 SF
Bidding
$13,000,000 CJ est. value
Largo, FL 33778

770 Apartments
New Construction - 79,981 SF
Post-Bid
$3,000,000 est. value
Saint Petersburg, FL 33701

Imagine Clearwater Park (Buildings, Hardscape, Landscape and Other Site Improvements)
New Construction
Post-Bid
$65,000,000 est. value
Clearwater, FL 34621

Development of Residential Property - Lealman Community Redevelopment Area
Results
Clearwater, FL 33756

Roadways and Public Rights-of-Way Minor Improvements
Results
Saint Petersburg, FL 33731

334 Saint Pete Residences
New Construction - 428,702 SF
Construction
$48,233,750 est. value
Saint Petersburg, FL

The Shores
New Construction
Construction
Saint Petersburg, FL 33712

Majestic Sand Condos
New Construction
Pending Verification
Clearwater, FL 33767

Icaria Gate Apartments
New Construction - 1,436,290 SF
Pending Verification
Tarpon Springs, FL 34689

Pompano Drive SE Townhomes
New Construction
Conception
$4,900,000 est. value
Saint Petersburg, FL 33705

Last Updated 09/07/2022 12:03 PM
Project Title

3rd Avenue South Multi-Family Building

Physical Address View project details and contacts
City, State (County) St Petersburg, FL 33701   (Pinellas County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $15,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of one building at 610 3rd Avenue South and 317 and 325 6th Street South. Scope details have not been released. As of September 7, 2022 the project is in planning stage. An appeal of a site plan approval will be heard by the City of St. Petersburg Development Review Committee on September 7, 2022. The owner will serve as general contractor. Information regarding the architect has not been disclosed. A construction timeline has not been determined, but is not expected to begin before 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

5 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents