Similar Projects
1922 2nd Avenue South
New Construction
Conception
$200,000,000 est. value
Birmingham, AL 35233

Hallmark Property Development - Warrior
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Warrior, AL 35180

The Star Uptown / Carraway Hospital Redevelopment
Demolition, New Construction, Infrastructure, Renovation
Design
$300,000,000 CJ est. value
Birmingham, AL 35234

The Star Uptown / Carraway Hospital Redevelopment
Demolition, New Construction, Infrastructure, Renovation
Design
$300,000,000 CJ est. value
Birmingham, AL 35234

Delcris Drive Sidewalk Phase 1
Infrastructure
Bidding
$200,000 CJ est. value
Homewood, AL 35226

RFP Design - Brighton Storm Shelters
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Birmingham, AL 35233

Southtown Senior / Birmingham
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Birmingham, AL 35233

Village Creek Water Reclamation Facility Reliability and Biological Improvements - Phase 3
Renovation, Infrastructure
Post-Bid
$45,000,000 CJ est. value
Birmingham, AL 35224

Ruffner Park Revitalization Phase I
Infrastructure
Results
Irondale, AL 35210

Security and Services Training Facility
Demolition, LEED Certification, New Construction, Infrastructure - 22,500 SF
Results
$12,375,000 CJ est. value
Birmingham, AL 35233

Mercantile on Morris a/k/a Founders Station-Phase II
Renovation - 14,000 SF
Construction
Birmingham, AL 35203

Eastwood f/k/a Gardendale
New Construction - 464,308 SF
Construction
$30,000,000 est. value
Gardendale, AL 35071

Country Club Apartments
Renovation
Pending Verification
Mountain Brook, AL

Douglas Commons
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Hoover, AL 35226

Green Meadows Apartments Mixed-use Development
New Construction, Infrastructure
Conception
$100,000,000 CJ est. value
Bessemer, AL 35022

Last Updated 03/06/2023 12:01 PM
Project Title

Douglas Commons On Patton Chapel Condominium

Physical Address View project details and contacts
City, State (County) Hoover, AL 35226   (Jefferson County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $8,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The change of zoning was presented to the Jefferson County Planning Commission October 14, 2021 and was approved. As of March 6, 2023, design has not started as the architect is waiting for the for the project to be released by the client. An architect has been selected. Information regarding general contractor has yet to be determined. No timeline for construction has been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

3 Stories Above Grade, New Construction, New Construction. 3 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents