Similar Projects
Reported 05/27/2021 12:00 AM
Project Title

Underground Storage Tank System Upgrade

Physical Address View project details and contacts
City, State (County) River Forest, IL   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Environmental Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of concrete pavement, asphalt pavement removal (replacement by others), fuel island concrete and features, surface equipment and components, the in-place upgrade of existing UST systems (6,000-gallon gasoline and 2,000-gallon diesel fuel), including the replacement of all existing tank-top equipment and product piping, the removal and replacement of existing leak detection system and existing fuel management system, and all other work specified to fully complete the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents