Similar Projects
Reported | 04/19/2020 12:00 AM |
Project Title | James L. King Federal Justice Building - Replacement of Building Fire Alarm System |
Physical Address | View project details and contacts |
City, State (County) | Miami, FL 33132 (Miami-Dade County) |
Category(s) | Single Trades |
Sub-Category(s) | Fire Protection |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A new Gamewell FCI– By Honeywell (E3) Complete Main Fire Alarm Control Panel (FACP) with Voice Evac was recently installed (08/2019), including main panel with touch screen color display and graphic annunciator, microphone, amplifiers, Intelligent Loop Interface-Main Board, Intelligent Loop Interface-Expansion Board, DACT, all cards, monitor modules, and control modules, all located within the Fire Command Room. A new Remote Annunciator Panel was also installed in the U.S. Marshals Control Room. Therefore, the remainder of the entire building wide fire alarm system on all floors will be removed and replaced including but not limited to all initiating devices, notification devices, wiring, tamper switches, flow switches, monitor modules, control modules, door release devices, Firefighter’s phones, and any remaining conduit not conducive for reuse. All elevator shaft smoke detectors and various spot smoke detectors located throughout the building will be removed and not replaced. An additional remote annunciator will be installed in the O&M office. New Firefighter’s telephone handsets and cabinet to be installed in Fire Command Room. The contractor will be responsible for a complete design for the project, including calculations, specifications, and drawings needed to perform the required modifications to the fire alarm and emergency communications system. The contractor will be responsible for the installation of all work and shall provide all material, equipment, accessories, commissioning and testing in compliance with the design documents. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |