Similar Projects
US 101/Schaerer Creek to Hood Canal - Remove Fish Barrier
Infrastructure
Conception
$2,661,000 CJ est. value
Cosmopolis, WA 98537

SR 105/S of Fairmount Ave - Culvert Replacement
Infrastructure
Conception
$2,945,000 CJ est. value
Aberdeen, WA 98520

US 12/Satsop River Bridge EB - Bridge Painting
Renovation, Infrastructure
Design
$4,410,000 CJ est. value
Aberdeen, WA 98520

US 101/Chicken Coop Creek - Remove Fish Barrier
Infrastructure
Design
$2,472,000 CJ est. value
Cosmopolis, WA 98537

RFP Engineering - Westport Marina Modernization Project Phase 1
Infrastructure
Bidding
$50,000 CJ est. value
Westport, WA 98595

Bus Wash Facility Improvements
Renovation, Infrastructure
Bidding
$900,000 CJ est. value
Hoquiam, WA 98550

Summit Pacific Medical Center (SPMC) Expansion / Renovation 50% CD Budget
Addition, Demolition, Build-out, Renovation, Infrastructure - 36,000 SF
Sub-Bidding
$10,000,000 CJ est. value
Elma, WA 98541

Airfield Pavement Maintenance
Term Contract
Post-Bid
Hoquiam, Quincy, WA 98550

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

12th Street Improvements and Water Line Replacement
Infrastructure
Results
Elma, WA

Satsop Haul Road Emergency Erosion Protection
Infrastructure
Construction
$305,312 CJ est. value
Aberdeen, WA 98520

SR 109/N of Moclips Highway - Stabilize Slope
Infrastructure
Design
$1,824,000 CJ est. value
Hoquiam, WA 98550

Oakville High School District Office Site Work
Infrastructure
Bidding
$300,000 CJ est. value
Oakville, WA 98568

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Last Updated 08/07/2023 04:39 PM
Project Title

SR 105, Washaway Beach Vicinity - Slope Protection

Physical Address View project details and contacts
City, State (County) Grayland, WA 98547   (Grays Harbor County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $532,898 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Extending corrugated polyethylene culvert pipe, placing streambed cobbles over dynamic revetment areas, stockpiling streambed cobbles, traffic control and other work. Involves 14 items and 30 working days. Work class 1. County : Pacific County Estimated value $500,000 - $600,000 A state funded contract with a 5% condition of award small business enterprise goal and a 2% condition of award veteran-owned business goal. Paul Mason Project Engineer ChehalisQA@wsdot.wa.gov WSDOT - SR 105, Washaway Beach Vicinity - Slope Protection *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents