Similar Projects
Cahaba River and Trussville WRF and AL SEIER Pump Station Phase 3 Improvements
Renovation
Bidding
$45,000,000 est. value
Birmingham, Trussville, AL 35244

Replace Three (3) Booster Pump Stations
Renovation
Bidding
AL

New Industrial Area Booster Pump Station
Post-Bid
Decatur, AL 35609

New Pumping Station (Contract C)
Post-Bid
Irvington, AL 36544

South Parkway Raw Water Pump Station Improvements
Results
Less than $2,294,106 est. value
Huntsville, AL 35804

Stonehill Booster Pump Station
Results
Talladega, AL 35160

Lift Station 1 Improvements Phase 2
New Construction
Bidding
Guntersville, AL

Rehabilitation of Pumping Station No. 2
Post-Bid
Less than $110,000 est. value
Samson, AL

VA Water Tank Improvements, Contract A: Water Booster Station Improvements
Results
Less than $436,956 est. value
Tuscaloosa, AL

Lift Station Upgrades
New Construction
Bidding
Chatom, AL

2020 Sanitary Sewer Lift Station Improvements
Post-Bid
Less than $300,000 est. value
Hayneville, AL 36040

Jones Road Pump Station Upgrade and Gravity Sewer
Results
Athens, AL 35613

1911 Spring Pump House Upgrade
New Construction
Bidding
Valley Head, AL

2020 Miscellaneous Pump Station Improvements (Pump Station 25, 31, and 37) Project
Post-Bid
Less than $2,500,000 est. value
Montgomery, AL 36109

Cherry Tree Booster Pump Station
Results
Less than $370,751 est. value
Huntsville, AL 35801

Reported 09/15/2021 05:12 PM
Project Title

Fort Morgan Road Sewer Improvements - Marina Lift Station and Peninsula Lift Station

Physical Address View project details and contacts
City, State (County) Gulf Shores, AL 36547   (Baldwin County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method
Project Status Construction Commenced July 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of the rehabilitation of 2 existing lift stations along Fort Morgan Road. One called the Marina Lift Station near Tacky Jacks, and the other Station called Peninsula (AKA P2) located on Peninsula Blvd. Both Stations will be by-passed, all pumps and hardware removed, the wet well will be cleaned, dried and lined with an approved lining material. Existing valve boxes will be removed, and the valve assemblies will be reconstructed above grade. New hardware including based elbows, guiderails, brackets, hatches, and piping will be replaced with new. New piping within the wet wells and up through the valve assemblies will be stainless steel. Both Stations will require the installation of a new manhole outside of the wet well. Existing pumps and panels will be reused. Approximately 120 linear feet of 12" ductile iron will be removed and replaced. With a contingency for another 150 linear feet with fittings. At least one (1) 12" insert-a-valve will be required with this work. There will be a series of add alternates to be priced as well.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents