Similar Projects
New Rosewood Middle School
New Construction
Conception
Goldsboro, NC

Alternative Programs School Renovation
Renovation
Conception
Greensboro, NC 27401

H12 New High School
New Construction - 360,000 SF
Design
$170,000,000 est. value
Apex, NC 27539

Combo RTP M-19/H-11 Middle and High School
New Construction
Design
$128,149,254 est. value
Morrisville, NC 27560

North Johnston High School Cafeteria Expansion
Renovation
Bidding
$500,000 est. value
Kenly, NC 27542

Learning Lab at Columbia High School
Renovation
Bidding
$2,000,000 est. value
Columbia, NC 27925

New Middle School
New Construction
Post-Bid
$61,000,000 est. value
Jefferson, NC

New Northern High School Replacement
New Construction - 278,613 SF
Post-Bid
$51,250,000 est. value
Durham, NC 27704

Henderson County Public Schools Rugby Middle School Office Renovation
Renovation
Results
Hendersonville, NC 28792

Columbia High School Learning Lab
Results
Columbia, NC 27925

Thales Academy at Chatham Park
New Construction - 54,284 SF
Construction
$4,092,533 est. value
Pittsboro, NC 27312

ABSS New High School
New Construction - 221,000 SF
Construction
NC

Ashley Academy Replacement - 2016 Bond - Winston-Salem Forsyth County Schools
New Construction
Pending Verification
$9,000,000 est. value
Fayetteville, NC 28304

D.H. Conley High School Media Center Addition
Addition
Conception
$20,280,000 est. value
Greenville, NC 27858

EE Smith High School Replacement
New Construction
Design
$85,000,000 est. value
Fayetteville, NC 28301

Last Updated 07/18/2022 11:42 PM
Project Title

South Brunswick Middle School-Canopy

Physical Address View project details and contacts
City, State (County) Southport, NC 28461   (Brunswick County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The general scope involves furnishing and installing of Aluminum Canopy Systems. Work to include but not limited to suppling of Engineered Drawings, include any cost for geotechnical soil borings or data if needed or required, include permit cost, include all material and labor for the layout of footings, dig, prep and place footings for canopy systems, and installation of canopy systems, and all incidental work relating to the project to provide the complete and fully functional operating canopy systems. Contractor is responsible for scope and to verify all dimensions and sizes.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents