Similar Projects
Kingman - Wickenburg Highway (Tegner St - Wickenburg Ranch W)
Infrastructure
Bidding
$54,950,000 CJ est. value
Congress, AZ 85332

Phoenix-Casa Grande Highway (Riggs Road - Gila River)
Infrastructure
Bidding
$5,500,000 CJ est. value
Chandler, AZ 85249

District Wide Cement Work
Alteration
Post-Bid
Scottsdale, AZ

Historic Courthouse Remodel
Build-out
Post-Bid
$11,910,820 CJ est. value
Kingman, AZ 86402

DEMA QTR Range Footings - Camp Navajo Single
Results
Bellemont, AZ 86015

Tumacacori National Historical Park (Tuma) Requires Services To Reseal Concrete Surfaces Throughout The Park
Term Contract
Results
Tumacacori, AZ 85640

Concrete Pad and Asphalt Repair Bldg
Infrastructure, Alteration
Post-Bid
Tucson, AZ 85706

Concrete and Concrete Materials for Aspc Winslow
Term Contract, Infrastructure
Results
Winslow, AZ 86047

Concrete Repair and Maintenance Services
Term Contract
Post-Bid
Chandler, AZ

Job Order Contracting for Concrete Services
Term Contract, Alteration
Results
$5,000 to $2,000,000 est. value
Kingman, AZ

Annual Street and Park Concrete Contract FY 22/23
Term Contract
Post-Bid
Prescott Valley, AZ

Landfill Reclaimed Concrete Project
Term Contract
Results
Casa Grande, AZ 85193

RFP D/B - Intersection Wellfield Pipeline
Infrastructure
Post-Bid
$300,000 CJ est. value
Peoria, AZ 85345

Landfill Diesel Fuel Tank/Concrete Pad Replacement Project
Alteration
Results
Casa Grande, AZ 85193

Supply and Deliver Portland Cement Concrete Products
Alteration
Results
Prescott, AZ

Last Updated 11/04/2022 06:02 PM
Project Title

Northern Parkway - El Mirage Alternative Access

Physical Address View project details and contacts
City, State (County) El Mirage, AZ 85307   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $5,385,699 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

ADOT TRACS NO. T0185 01C Work to include; roadway construction for Northern Parkway, including new collector streets in the Butler Drive and 129th Avenue alignments, drainage system, asphalt concrete pavement, lighting, signing and striping. This project is subject to Davis Bacon wage requirements. For this contract, a DBE goal of 14.96% is established for Disadvantaged Business Enterprises. The contractor, sub recipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate. All construction work on this contract is to be completed within 180 CALENDAR DAYS beginning with the date specified in the Notice to Proceed. Exclusive of and following the contract time allowed for construction work are 120 CALENDAR DAYS for internal administrative purposes thereby resulting in a total contract performance period of 300 CALENDAR DAYS.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents