Similar Projects
Enlisted Barracks 1, 2, 3, and 4
New Construction - 48,830 SF
Results
$25,000,000 to $27,000,000 est. value
Salem, OR 97301

The Camp Umatilla Training Center Front Entry Gate Phase I
New Construction
Results
$900,000 to $1,200,000 est. value
Hermiston, OR 97838

USDA Timber Lake Multi Building HVAC
Build-out, Renovation
Post-Bid
$250,000 CJ est. value
Estacada, OR 97023

Project P185U - Naval Operational Support Center (NOSC)
New Construction, Addition
Post-Bid
$5,000,000 to $10,000,000 est. value
Portland, OR 97217

Fire Extinguisher Maintenance Services
Term Contract
Design
The Dalles, OR 97058

Camp Rilea Building 7160 Repairs
Renovation
Results
$185,000 to $250,000 est. value
Warrenton, OR 97146

Jackson Armory Aslep Design Build Project
New Construction
Results
$3,500,000 to $4,300,000 est. value
Portland, OR 97218

Oregon National Guard- Multiple Award Task Order Contract (MATOC)
New Construction, Renovation
Post-Bid
Klamath Falls, Portland, OR

Oregon National Guard- Multiple Award Task Order Contract (MATOC)
New Construction, Renovation
Post-Bid
Klamath Falls, Portland, OR

Fuel Pad Parking Cover Central Oregon Unit Training and Equipment Site
Renovation, Alteration
Results
$265,000 to $310,000 est. value
Salem, OR 97301

Regional Armory Emergency Enhancement Project
Renovation
Post-Bid
Pendleton, OR 97801

VA Portland Pave Top Deck Building 102
Renovation
Bidding
$1,000,000 CJ est. value
Portland, OR 97239

Last Updated 09/16/2022 10:11 AM
Project Title

Camp Umatilla Training Center (CUTC) Automated Record Fire (ARF) Range Upgrades

Physical Address View project details and contacts
City, State (County) Hermiston, OR 97838   (Umatilla County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $19,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For Camp Umatilla Training Center (CUTC) Automated Record Fire (ARF) Range Upgrades The Work contemplated under this Contract includes all labor, materials, transportation, equipment and services for, and incidental to, the completion of all construction Work in connection with the project described in the ITB and Contract Documents . Convert existing Modified Record Fire (MRF) from pneumatic target controls to an Automated Record Fire (ARF) training range with electric target controls. Each Offer must be accompanied by a certified or cashier's check, irrevocable letter of credit issued by an insured institution as defined in ORS 706.008, or Bid Bond, payable to the OMD in an amount equal to ten percent (10%) of the total amount of the Offer. The successful Offeror must furnish a Performance Bond and a Payment Bond each in the total amount (100%) of the awarded Contract, executed in favor of the State of Oregon, to ensure faithful performance of the Contract and payment for services and goods. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project Start Date: 15 Calendar Days From Issuance of Notice to Proceed. Substantial Completion: 150 Calendar Days From Issuance of Notice to Proceed . Final Completion: 180 Calendar Days From Issuance of Notice to Proceed . OMD reserves the right to reject all Bids. Liquidated damages will not apply to the contract resulting from this ITB . 8 assessment of liquidated damages, when withholding is made for offset purposes . The Contractor having liquidated and delinquent debt owed to the State of Oregon or any department or agency of the State of Oregon.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents