Similar Projects
Last Updated | 10/21/2022 09:43 AM |
Project Title | Ankeny Pump Station - Portland Bureau of Environmental Services |
Physical Address | View project details and contacts |
City, State (County) | Portland, OR 97204 (Multnomah County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids |
Project Status | Construction start expected April 2020 |
Bids Due | View project details and contacts |
Estimated Value | $250,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Proposal: Two underground vaults to house the odor treatment system for the Ankeny Pump Station were constructed in 2008/2009 during the renovation of Tom McCall Waterfront Park for the Portland Saturday Market. The vaults were constructed within 50 feet of top of bank of the Willamette River (within the River Setback area). Although the park renovations received land use approval the vaults were not included and were installed as a change-order during construction of the approved park renovations. The vaults did not go through the Citys required land use review processes. In 2015, a water pipe broke inside the vaults causing them to flood. The odor treatment system has been out of service since this mechanical failure. The applicant, the Citys Bureau of Environmental Services, proposes to replace the equipment within the vaults to treat odors from the Ankeny Pump Station wet well and the Ankeny CSO shaft. The project would replace the equipment inside of the Blower Vault and the Media Vault to bring the odor treatment system back on-line and to meet the Citys venting and odor control design for the Ankeny Pump Station and Ankeny CSO shaft. Site Address: 30 SW NAITO PKY As of November 19, 2019, this project is conceptual. Bidding for designer, contractor and construction start date have not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |