Similar Projects
Roofing Rural Center - Municipal Reimbursement - Wake County
Alteration
Conception
$485,000 est. value
Raleigh, NC 27601

Marbles Kids Museum and IMAX Theater Roof Replacement
Alteration
Bidding
$500,000 est. value
Raleigh, NC 27601

Roof Evaluations - Non-Shingle Roofs
Alteration
Bidding
Raleigh, NC

Dorothea Dix Gipson Play Plaza - Bid Packages 3A, 4A, 7B, 22A and 31C
New Construction, Infrastructure
Sub-Bidding
$40,000,000 CJ est. value
Raleigh, NC 27603

Olivia Raney Library Roof Replacement
Post-Bid
Raleigh, NC 27610

Transportation Complex Old Art Museum - Roof Replacement
Alteration
Post-Bid
Raleigh, NC

DPS - Rockingham Youth Development Center: Roofing
Results
Raleigh, NC 27230

Fire Station Roof Replacement
Results
Raleigh, NC 27604

Rush Hour II Indoor Karting
New Construction - 47,472 SF
Construction
$4,500,000 est. value
Morrisville, NC

Utility Support - NROC Roof System Installation
Alteration
Post-Bid
Raleigh, NC 27610

Parks-Shingle Roof Replacements-8 Sites
Results
Raleigh, NC 27601

Foundation for the Seasonal Ice Rink at Red Hat Amphitheater
New Construction
Post-Bid
Raleigh, NC 27601

Eastgate Neighborhood Center Roof Replacement
Results
Raleigh, NC 27602

Green Roof Project
Alteration
Post-Bid
Raleigh, NC 27603

Roof Condition Survey (RCS) and Roof Management System (RMS)
Results
Raleigh, NC

Last Updated 08/01/2022 04:31 PM
Project Title

2023 Park Shelters Roof Repairs

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27601   (Wake County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Misc. Recreational, Roofing
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline 08/11/2022 at 2:00 PM ET 1. All shingles and felt shall be removed to the decking 2. Install new felt paper 3. Replace with a 30-year architectural brown shingle (Include Limited Lifetime warranty, fungus resistant architectural grade shingles.) 4. All facia shall be replaced with pressure treated lumber. (non-painted) 5. Clean up and haul away all job-related debris. Coordination with shelter rentals schedule may be necessary. Furnish, erect, and maintain temporary facilities and perform temporary work required in the performance of this Contract, including those shown and specified. The following supplements modify the City of Raleighs General Conditions for Construction. Where a portion of the General Conditions is modified or deleted by these Supplementary Conditions, the unaltered portions of the General Conditions shall remain in effect. These modifications shall be incorporated into all Contract Forms. The Contractor shall furnish a Contract Performance Bond and a Payment Bond, each equal to one hundred percent (100%) of the Contract Price if the base bid price exceeds $300,000. However, the City may impose this requirement on any contract in excess of $30,000. Bonds given shall meet the requirements of the law of the State of North Carolina including but not limited to G.S. 143-129 and G.S. 44A-26. The surety on each Bond shall be a surety company satisfactory to the City and duly authorized to do business in the State of North Carolina . The goal breakdown is 8% for minorities and 7% for non-minority females.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents