Similar Projects
MacClenny Hotel
New Construction
Conception
Macclenny, FL 32063

Public Safety Complex / Driver Safety & Training Track
Infrastructure
Bidding
$1,000,000 CJ est. value
Sanderson, FL 32087

Public Safety Complex / Driver Safety & Training Track
Infrastructure
Bidding
$1,000,000 CJ est. value
Sanderson, FL 32087

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Baker County Transportation Facility Bus Wash Building
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Macclenny, FL 32063

Paving/Resurfacing of Reid Stafford Road - Phase II (Section A)
Results
FL 32040

Asphalt Repair
Results
$350,000 est. value

Sanderson Fire Station (Site Work Only)
Infrastructure
Bidding
$200,000 CJ est. value
Sanderson, FL 32087

SR 25 (US 41 / US 441) from I-75 (SR 93) to CR 252
Infrastructure
Post-Bid
$9,805,526 est. value

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Sanderson Fire Station (Building Only)
New Construction, Infrastructure - 7,000 SF
Bidding
$3,000,000 CJ est. value
Sanderson, FL 32087

Baker County Central Fire Rescue Station Paving
Infrastructure
Post-Bid
Glen Saint Mary, FL 32040

Woodstock Industrial Park Access Road and US 90 Turn Lanes
Infrastructure
Results
FL

Well and Septic Systems
Infrastructure
Bidding
$30,000 CJ est. value
Sanderson, FL 32087

East Boulevard Widening and Resurfacing
Infrastructure
Post-Bid
$2,000,000 est. value
Macclenny, FL 32063

Last Updated 09/14/2022 05:11 PM
Project Title

Holiday Inn Express / Macclenny

Physical Address View project details and contacts
City, State (County) Macclenny, FL 32063   (Baker County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $22,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 14, 2022, a building permit has not been issued. A general contractor has been selected. A firm construction timeline has not been determined.

Details

4 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents