Similar Projects
North Edgehill Commons
New Construction, Infrastructure - 160,000 SF
Design
$361,000,000 CJ est. value
Nashville, TN 37203

MTRO Essential Maintenance
Renovation, Infrastructure
Design
$3,400,000 CJ est. value
Nashville, TN 37214

Construction of K-25 Building, Roads and Grounds Improvements
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Oak Ridge, TN 37830

2021 Community Development Block Grant (CDBG) Sanitary Sewer Line Extensions
Infrastructure
Bidding
$400,000 CJ est. value
Harrogate, TN 37752

Bedford Country Higher Education Center for Tennessee College of Applied Technology (TCAT) - Shelbyville
New Construction, Infrastructure - 105,000 SF
Sub-Bidding
$5,000,000 CJ est. value
Shelbyville, TN 37160

Site Preparation/Excavation
Post-Bid
Cleveland, TN 37311

Laurel Branch Park Site Preparation and Sewer Extension
Infrastructure
Post-Bid
Maryville, TN 37801

Rockfall Mitigation on U.S. 19E (S.R. 37) at L.M. 8.7
Infrastructure
Results
TN

Ground Base PV Array
New Construction, Infrastructure
Results
$4,879,004 CJ est. value
Louisville, TN 37777

Smith & Wesson Headquarters
New Construction
Pending Verification
$125,000,000 est. value
Maryville, TN

VP Racing Fuels
New Construction
Pending Verification
$14,000,000 est. value
Mc Kenzie, TN

Storyville Gardens Phase 1
New Construction, Infrastructure
Design
$300,000,000 CJ est. value
Nashville, TN 37219

RFP - 246 North Rankin Road Development
New Construction, Infrastructure
Bidding
$235,798 CJ est. value
Alcoa, TN 37701

Herman Street Mixed-Use
New Construction, Infrastructure - 2,000 SF
Post-Bid
$100,000,000 CJ est. value
Nashville, TN 37208

TULLAHOMA 2021 CDBG IMMINENT THREAT ROAD IMPROVEMENT
Infrastructure
Results
$595,000 CJ est. value
Tullahoma, TN 37388

Last Updated 01/04/2023 12:07 PM
Project Title

Piedmont Lithium Processing and Manufacturing Facility

Physical Address View project details and contacts
City, State (County) Etowah, TN 37331   (McMinn County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $582,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a lithium hydroxide processing, refining and manufacturing facility. Further scope details have not been provided. As of January 4, 2023, this project is in the early planning stages and has been awarded a grant from the U.S. Department of Energy. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is expected to be completed by 2025.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents