Similar Projects
High School Gym Construction
New Construction
Design
Mercedes, TX

La Joya ISD Esser Funds - Canopy Structures Phase 3
Infrastructure
Design
$98,000 CJ est. value
La Joya, TX 78560

Playscape Repairs
Infrastructure
Bidding
$65,000 CJ est. value
Pharr, TX 78577

Edinburg Consolidated Independent School District (ECISD) Board Room and Studio Audio Visual Upgrade
Renovation
Bidding
$295,656 CJ est. value
Edinburg, TX 78539

Gutter System Replacement -RE-BID
Renovation
Sub-Bidding
$400,000 CJ est. value
Mercedes, TX 78570

Concrete and Related Items
Term Contract
Sub-Bidding
Edinburg, TX 78539

PSJA ISD LBJ Middle School Phase II Additions and Renovations
Renovation, Addition
Post-Bid
Less than $8,500,000 est. value
Pharr, TX 78577

Career and Technical Education Center
Renovation - 100,000 SF
Post-Bid
$16,500,000 est. value
Edinburg, TX 78541

Edinburg Bus Barn-Maintenance Building
Results
$2,000,000 est. value
Edinburg, TX 78539

Construction Services Job Order Contract (JOC)
Results
La Joya, TX

Brewster Elementary/Middle School - New Fine Arts Building
Construction
Less than $1,560,000 est. value
Edinburg, TX 78541

Agricultural Learning Center
Construction
$2,300,000 est. value
McAllen, TX 78504

McAllen High School, McAllen Memorial Highs School, and James "Nikki" Rowe High School New Mariachi and Black Box Buildings
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
McAllen, TX 78504

Fire Suppression System Inspection and Repair
Term Contract
Sub-Bidding
Edinburg, TX 78539

GMP 3 - Natatorium Facility
Post-Bid
McAllen, TX

Last Updated 08/03/2022 08:01 PM
Project Title

Culinary Arts Laboratory at Mission High School

Physical Address View project details and contacts
City, State (County) Mission, TX 78572   (Hidalgo County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected July 2022,
Bids Due View project details and contacts
Estimated Value $284,618 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Mission Consolidated Independent School District will be accepting competitive sealed proposals for Culinary Arts Laboratory at Mission High School Question Deadline May 23, 2022 at 2:00 PM Independently and not as an agent of the District, the Contractor shall furnish all the necessary qualified personnel, materials, supplies, and equipment not otherwise provided by the district, and do all things necessary to provide services.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents