Similar Projects
Englewood Avenue Multi-Residential Apartment
New Construction, Infrastructure, Alteration
Design
$9,000,000 est. value
Teaneck, NJ 07666

Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
$250,000 to $500,000 est. value
Camp Lejeune, Jacksonville, NC

2022 NJDOT Roadway Improvements and Municipal Road Program
Infrastructure
Bidding
$600,000 est. value
River Vale, NJ

2021 Road Resurfacing and Repairs of Various Village Streets
Post-Bid
Ridgewood, NJ

Phillips Avenue Improvement Project and Phase 2
Post-Bid
South Hackensack, NJ

Leonia Avenue Improvements Project Phase III and IV
Results
Bogota, NJ

2020 Road Resurfacing Program at Various Locations
Results
Bogota, NJ 07603

CDBG Year 47 Bryant Place Resurfacing project
Infrastructure
Bidding
$700,000 est. value
Ridgefield, NJ

North 5th Street Project
Post-Bid
Park Ridge, NJ 07656

2019 NJDOT Municipal Aid and Transit Village Funded Grant - Main Street Streetscape and Two-Way Conversion Phase II
Results
Hackensack, NJ 07601

Reconstruction of Alfred Avenue
Infrastructure
Bidding
$600,000 est. value
Teaneck, NJ 07688

Finnigan and Weller Road Improvement Program
Post-Bid
Saddle Brook, NJ 07663

Reconstruction and Safety Improvements - Valley Road
Results
Haworth, NJ 07641

2022 Road Improvement Program
Infrastructure
Bidding
$330,000 est. value
Bergenfield, NJ

On-Call Time And Materials Services - Asphalt Paving And Concrete
Post-Bid
Oakland, NJ

Last Updated 07/15/2022 11:00 AM
Project Title

Improvements to Bluff Road

Physical Address View project details and contacts
City, State (County) Fort Lee, NJ 07024   (Bergen County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

IMPROVEMENTS TO BLUFF ROAD BOROUGH OF FORT LEE BERGEN COUNTY, NEW JERSEY The Work to be performed under this contract includes the milling and resurfacing of Bluff Road from Morningside Lane to Glen Road (New Jersey State Highway Route 5). Also included are ADA curb ramps, sidewalk, driveway and curb replacement, and other incidentals. Principal items of Work in the project include: . 4,500 S.Y. HMA Milling, 3" or Less . 605 TON Hot Mix Asphalt 9.5M64 Surface Course . 360 S.Y. Concrete Sidewalk, Reinforced, 6" Thick . 1,020 L.F. 9" x 18" Concrete Vertical Curb The Work contemplated under this Contract shall be completed within 75 calendar days of notice to proceed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents