Similar Projects
Lift Station and Waste Water Treatment Plant Site Improvements to Serve Oxford Place Phase 1
Alteration
Post-Bid
McKinney, TX

Wilson Creek Lift Station Improvements
Results
Less than $7,500,000 est. value
McKinney, TX 75069

Magnolia, Phase 5 Lift Station Improvements
Results
Josephine, TX 75164

Shawnee Trail Lift Station 1 Improvements
Results
$114,000 est. value
Celina, TX

Plano Spring Creek Lift Station No. 2 Improvements
Results
$7,000,000 to $9,000,000 est. value
Plano, TX 75075

Mantua Point Phase 1 Sewer Lift Station and Force Main
Results
Frisco, TX

Maxwell Creek Lift Station Bypass Pump
Results
Allen, TX 75002

Custer Road Pump Station Meter Vault Relocation
Results
$3,454,363 est. value
Prosper, TX 75078

5.0 MG Central Pump Station, 1.0-MG Awwa D110 Type III Ground Storage Reservoir and N.T.M.W.D. Meter Station
Results
$5,551,800 est. value
Parker, TX 75002

Seis Lagos Pump Station Improvements
Results
Less than $850,000 est. value
Lucas, TX 75002

City of Princeton Dogwood Pump Station Tank Mixing & Chloramine Boosting System
Results
Princeton, TX 75407

Inspiration - Lift Station No. 3
Results
Lucas, TX 75002

High Service Pump Station 3-1 Expansion
Results
$14,000,000 to $15,000,000 est. value
Wylie, TX 75098

Office Booster Pump Project
Results
Wylie, TX 75098

Reuse Pump Station Improvements
Results
$10,000,000 to $14,000,000 est. value
Frisco, TX

Last Updated 07/22/2021 05:04 AM
Project Title

North McKinney Transfer Lift Station Project and North McKinney Transfer Force Main Project - Phase 1 and 2 Improvements

Physical Address View project details and contacts
City, State (County) McKinney, TX   (Collin County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $70,000,000 to $95,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the construction of a new lift station, North McKinney Transfer Lift Station (NMTLS), with a total capacity of 128 MGD, which includes the installation of nine (9) new dry pit solids handling pumps, each with new motors controlled by adjustable frequency drives (AFDs). The project also includes the construction of associated yard piping, a junction box to split flow between the existing NMLS and new NMTLS, a flow meter vault for the new NMTLS, an electrical building for the new NMTLS and backup generators for the new NMTLS. This project also includes the construction of two 48-inch force mains with associated appurtenances that begin at the flow meter vault at the new NMTLS and continue along the proposed alignment for approximately 4.4 miles to the new Sister Grove Regional Water Resource Recovery Facility (SGRWRRF). The project includes a fiber optic communication cable that will run parallel to the proposed force mains and connect at the new SGRWRRF. The force main project also includes permanent access driveways.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utility Distribution Piping, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents