Similar Projects
Union Street Pumping Station
Construction
Less than $2,500,000 est. value
Portsmouth, RI

Public Water System Improvements - New South Booster Pump Station and North Booster Pump Station Improvements
Results
Less than $834,600 est. value
North Scituate, RI 02857

Middlebridge Pump Station Flood Protection
Results
South Kingstown, Wakefield, RI 02879

Last Updated 04/16/2021 02:26 PM
Project Title

Galilee Pump Station Valve Replacement and Pump Removal and Installation

Physical Address View project details and contacts
City, State (County) Narragansett, RI   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and dispose two (2) existing 6-inch diameter pump suction isolation valves and furnish and install two (2) replacement valves with new wrench operators. Remove and dispose two (2) existing restrained flanged coupling adapters and furnish and install two (2) replacement fittings. Remove and dispose one (1) existing wastewater pump (Pump No. 1) and install one (1) replacement pump to be furnished by the Town. Contractor shall provide all necessary labor, equipment, materials and components as required to complete the work unless specifically indicated otherwise, and shall provide a one (1) year warranty for all work and materials furnished by the Contractor. Contractor shall protect all components of the existing facility to remain and conduct the work without damaging the existing station. The suction valve replacement work must be completed in one day (both valves replaced in single work shift). Contractor must complete the valve replacement work and removal of existing pump no later than June 14, 2021. Contractor shall complete the new pump installation work within two (2) weeks of delivery from the manufacturer (anticipated delivery June 14, 2021). All work must be scheduled in advance with the Town. The work site is located at the Galilee Pump Station, 335 Great Island Road, Narragansett, RI 02882 (at intersection of Galilee Escape Road).

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents