Similar Projects
Last Updated | 09/05/2023 03:32 PM |
Project Title | 8th Street Improvement Project |
Physical Address | View project details and contacts |
City, State (County) | Dovre Township, MN 56201 (Kandiyohi County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $508,718 [brand] Estimate |
Plans Available from | Civil Engineer - 06/09/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Description: Mobilization 1 Ls Aggregate Base Class 5 180 Ton Full Depth Bituminous Pavement Reclamation (P) 10,500 SQ YD Haul Full Depth Reclamation 100 Cu YD Mill Bituminous Pavement (1.5") 150 SQ YD Type SP 9.5 Wearing Course Mixture (2,b) 1,210 Ton Type SP 12.5 Non Wearing Course Mixture (2,b) 1,210 Ton Type SP 9.5 Wearing Course Mixture (2,b) 2.5" Thick 721 SQ YD 15" RC Pipe Culvert 64 LF 18" RC Pipe Culvert 32 LF 6" Concrete Driveway Pavement 3,700 SQ Ft Relocate E911 Signs 45 EA Install Mailbox Support 45 EA Traffic Control 1 Ls Silt Fence, Type Machine Sliced 400 LF Select Topsoil Borrow 370 Cu YD Soil Bed Preparation 1 Acre Seeding 1 Acre Seed, Mixture 25-151 132 LB Hydraulic Stabilized Fiber Matrix 3,300 LB Watering Turf 50 MGAL |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |