Similar Projects
Smith-Barnes Sewer Basin Rehabilitation - Phase II
Infrastructure
Bidding
Stockbridge, GA

Lighthouse Area Sewer Phase II
Infrastructure
Bidding
Tybee Island, GA

VA Outpatient Clinic Water and Sewer Improvements
Post-Bid
Zebulon, GA 30295

On-Call Contract Services for Sewer Maintenance
Post-Bid
Brunswick, GA 31520

Splost North Mainland Phase III Force Main Improvement
Results
Less than $2,800,000 est. value
Brunswick, GA 31520

General Stewart Way Sewer Extension
Results
Less than $78,330 est. value
Hinesville, GA 31310

I-16 Regional Water and Sewer Material Procurement
Infrastructure
Bidding
GA

2017 CDBG Sewer System Improvements
Post-Bid
Fort Valley, GA 31030

Chenocetah Drive Water and Sewer System Improvements
Results
Cornelia, GA 30531

Septic and Grease Tank Pumping Services, Annual Contract
Term Contract
Post-Bid
Gainesville, GA 30503

Sanitary Forcemain
Results
Less than $731,350 est. value
Calhoun, GA 30703

FY 2015 USDA Sewerage System Improvements
Post-Bid
Porterdale, GA 30070

2019 CDBG Park District 2: Phase I
Results
Less than $997,385 est. value
Griffin, GA 30223

Grease Trap Cleaning
Term Contract
Post-Bid
Jonesboro, GA 30326

Moses Middle School Sewer Extension
Results
Less than $153,428 est. value
Dallas, GA 30132

Reported 11/24/2021 12:00 AM
Project Title

Perry Branch Gravity Sewer

Physical Address View project details and contacts
City, State (County) Perry, GA   (Houston County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, traffic and pedestrian control, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete the following: Cleaning sanitary pipes and CCTV inspection along existing Perry Branch Gravity Sewer trunk main. The work shall include cleaning and CCTV inspection of approximately 259 L.F. of 10” PVC pipe, 1,657 L.F. of existing 12” PVC pipe, 6,300 L.F. of existing 12” DI pipe, 639 L.F. of 12” clay pipe, and 41 existing manholes. The purpose of this project is to locate interconnections and services for replacement of the existing gravity sewer system. The deliverable shall include all video and inspection reports inclusive of the work.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents