Similar Projects
Vinny Norwood Road Improvements Phase 2
Renovation
Post-Bid
Old Town, ME 04468

Hot Mix Bituminous Asphalt Pavement
Post-Bid
Hampden, ME

Pavement 2020
Results
Bangor, ME

Bridge Work, Pavement Milling, Ultra-Thin Bonded Wearing Course, Hot Mix Asphalt Overlay with Safety Improvements
Results
Bangor, Carmel, Hampden, Hermon, Newburgh, Old Town, Orono, Veazie, ME 04401

Pavement 2021 Project
Infrastructure
Post-Bid
Brewer, ME

Intersection Improvements
Results
Hermon, ME 04401

Paving
Infrastructure
Post-Bid
Medway, ME 04460

Reclaim and Pave Highland Avenue and Bullen Street
Results
Bradley, ME 04411

Z--Brush,Grade,Drain Philpott Bridge Road
Term Contract
Post-Bid
Millinocket, Penobscot, ME 04462

2020 Resurfacing
Results
Brewer, ME 04412

Levinson Center Paving Project
Infrastructure
Post-Bid
Bangor, ME 04401

2020 Paving Project
Results
Milford, ME

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Road Paving Project
Results
Kingman, ME 04451

Gravel Road Construction
Results

Last Updated 12/08/2021 12:34 PM
Project Title

New Connector Construction/Project is Located 0.47 Mile West Of I- 395 and Route 1A /Extending 6.05 Miles Roughly Parallel to the Brewer-Holden Town Line

Physical Address View project details and contacts
City, State (County) Brewer, Eddington, ME 04428   (Penobscot County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New Connector Construction/project is located 0.47 mile west of I- 395 and Route 1A /Extending 6.05 miles roughly parallel to the Brewer-Holden town line to Route 9 approximately 0.90 mile west of the Chemo Pond Road. Description: Maine Federal Aid Project No. 1891500 WIN. 018915.00 Location: In Penobscot County, project is located 0.47 mi. west ofI-395 and Rte.IA. Extending 6.05 miles roughly parallel to the Brewer - Holden town line, to Rte.9. Approx. 0.90 mi. west of Chemo Pond Rd.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents