Similar Projects
Last Updated | 03/22/2022 12:27 PM |
Project Title | Wastewater Treatment Facility Improvements |
Physical Address | View project details and contacts |
City, State (County) | Wisconsin Dells, WI 53965 (Sauk County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,200,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Removal and Replacement of Center Pier in an existing clarifier, installation of aluminum geodesic dome, removal and replacement of existing grout floor in existing clarifier, new FRP effluent structure and orthophosphate analyzer, liner installation in two (2) digester basins, and installation of a positive displacement blower. In addition to the treatment upgrades, the project consists of removal and replacement of concrete sidewalk and pad, removal and replacement of existing ballasted membrane roof, removal and replacement of existing exterior cladding system, process electrical modifications, protective coatings/painting of blower piping and clarifier equipment, and new lighting in an enclosed clarifier. |
||||||||||||||||||||||||||||||||||||||||||
Details | Sewage Treatment Plant, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |