Similar Projects
South Old Woodward Avenue Reconstruction Project (Phase 3)
Alteration
Bidding
$8,000,000 est. value
Birmingham, MI

Auburn Road Rehabilitation And Water Main Replacement Project
Alteration
Bidding
Rochester Hills, MI

Water Maintenance Parts
Term Contract
Post-Bid
Oakland, MI

T4: Infrastructure
Post-Bid
Highland, MI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Richland Gardens Area Water Main project
Results
Less than $4,021,000 est. value
Farmington, MI 48336

2022 Pavement Reconstruction & Water Main Replacement
Alteration
Bidding
Huntington Woods, MI

Lead Service Line Replacement
Infrastructure
Post-Bid
$5,000,000 est. value
MI

2020 Drinking Water Revolving Fund Water System Improvements Open Cut
Results
Rochester, MI 48307

Kenmore and Cornwall Water Main and Pavement Replacement
Infrastructure
Bidding
Berkley, MI

Replacement Water Main Phase II
Alteration
Post-Bid
Rochester, MI 48309

Parker Hydraulic Hoses, Fittings And Miscellaneous Services
Results
Rochester Hills, MI

Pasadena Park Fire Hydrant Extension (CDBG)
Alteration
Bidding
Farmington Hills, MI

Royal Oak Township Lead Service Line Replacement
Alteration
Post-Bid
Ferndale, MI

2020 DWSRF Water System Improvements Directional Drill
Results
Less than $2,673,290 est. value
Rochester, MI 48307

Last Updated 03/04/2022 11:49 AM
Project Title

2022 Water Main Improvement Program

Physical Address View project details and contacts
City, State (County) Ferndale, MI   (Oakland County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installing 2,000 feet of ductile iron water main within the public right-of-way of Leitch Road (E. Nine Mile to Orchard) and Wrenson Street (E. Nine Mile to Breckenridge). Included in the work is the replacement of existing gate valves and fire hydrants, 80 domestic water services, 1,300 square yards of concrete pavement replacement, 5,000 square feet of sidewalk and ADA ramp replacement, 600 feet of concrete curb and gutter replacement, 6,600 square yards of HMA cold milling and HMA Surface removal, 1,200 tons of HMA paving, lawn restoration and other associated work item

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents