Rehabilitate Runway - City of Elkhart
Infrastructure
Design
$250,000 est. value
Elkhart, IN 46514

Rehabilitate Runway - City of Elkhart
Infrastructure
Design
$250,000 est. value
Elkhart, IN 46514

Fieldhouse Ave Water & Sewer Extension 6th to 7th St
Infrastructure
Bidding
$700,000 CJ est. value
Elkhart, IN 46516

2021-1 Community Crossing Resurfacing
Infrastructure
Post-Bid
Millersburg, IN

Anan Ulery Tile at CR 38 Relocation
Alteration
Post-Bid
Less than $230,000 est. value
IN

Oakland Avenue Trail Improvements
Infrastructure
Results
Nappanee, IN 46550

Fairfield Jr./Sr. High School 2022 Site Improvements
Infrastructure
Results
Goshen, IN 46526

Bike / Pedestrian Facilities
Infrastructure
Design
$2,878,765 CJ est. value
Goshen, IN 46528

Hardee`s Parcel Improvements
Addition, Infrastructure
Post-Bid
Elkhart, IN

Added Travel Lanes and Small Structure Replacement
Infrastructure
Results
$47,079,950 est. value
IN

2022 Curb Ramp Project
Infrastructure
Post-Bid
Elkhart, IN

Asphalt Resurface and Bridge Replacement- US 20
New Construction, Infrastructure
Results
$6,059,192 est. value
IN

2022 CCMG Paving Program
Infrastructure
Post-Bid
Goshen, IN

Miriam Avenue Improvements
Infrastructure
Results
Nappanee, IN

River Greenway Trail Improvements
Infrastructure
Post-Bid
Elkhart, IN 46516

Last Updated 07/03/2023 01:48 PM
Project Title

2023 ADA Curb Ramp Project

Physical Address View project details and contacts
City, State (County) Elkhart, IN 46516   (Elkhart County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $195,335 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Summary: Remove non- Compliant curb ramps, crub 7 gutter, and portion of sidewalk in order to install ADA compliant crub ramps. The Board reserve rights to waive informalities or irregularties, and to reject any all bids or portions therof. Project Summary: Remove non-compliant curb ramps, curb & gutter, and portions of sidewalk in order to install ADA compliant curb ramps according to the "Proposed Guidelines for Pedestrian Facilities in the Public Right-of-Way." Bidders are requested to submit any pre-bid questions regarding the project plans or specifications in writing to the City of Elkhart on or before 5:00 PM Elkhart time on Wednesday, May 31, 2023. Questions may or may not be addressed by addendum as deemed appropriate by the City of Elkhart. Contact information: Name: Mark Lucas, Engineering Tech. Address: 1201 S. Nappanee St. Elkhart, Indiana 46516 Phone: 574-293-2572 E-mail: mark.lucas@coei.org

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents