Similar Projects
Midfield Apron Expansion Water and Sewer Improvements
Bidding
$550,000 est. value
Gallatin, TN 37066

Downtown Water Mains - Phase I, Phase 2, and Phase 3
Infrastructure
Bidding
Morristown, TN

36" Dezurik Knife Gate Valves
Post-Bid
Chattanooga, TN 37400

CDBG 2019 Wastewater Collection Improvements
Post-Bid
Rockwood, TN

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Cured-In Place Pipe
Infrastructure
Bidding
Rogersville, TN

Moccasin Bend WWTP Equalization Basin And Blower Replacement Improvements
Post-Bid
Chattanooga, TN 37405

Purchase of AMR Style Water Meters
Results
Signal Mountain, TN 37377

Underground Utility Location Services
Infrastructure
Bidding
Nashville, TN

2018 CDBG Water System Improvements - 5th Street and City Tank Area
Post-Bid
$400,000 to $450,000 est. value
Jellico, TN

2020 Red Bank Sewer Rehabilitation
Results
Red Bank, TN

New Canada Road 24" Main
Infrastructure
Bidding
Lakeland, TN 38002

Water and Sewer Line Replacement
Post-Bid
$180,000 to $220,000 est. value
Jellico, TN

Snow Hill Road Force Main Repair Phase 1
Results
Less than $77,850 est. value
Chattanooga, TN

Last Updated 08/05/2021 10:25 AM
Project Title

Water Main Upgrades Eastward Expansion Project

Physical Address View project details and contacts
City, State (County) TN   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work in general consists of the following approximate quantities: 1. The Project consists of approximately 9,600 linear feet (LF) of12-inch water main in Washington County. Line A isapproximately 3,900 LF and connects King Spring Road at Monarch Court to an existing 8-inch water main on the north side of Elizabethton Highway. Line B is approximately 5,700 LF connects to an existing 8-inch water main on the south side of Elizabethton Highway to Swadley Road at Plymouth Road. The project includes valves, fittings, hydrants, together with miscellaneous civil work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents