Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Osterburg Scrubgrass Creek
Infrastructure, Renovation
Design
$3,399,179 CJ est. value
Osterburg, PA 16667

Osterburg Scrubgrass Creek
Infrastructure, Renovation
Design
$3,399,179 CJ est. value
Osterburg, PA 16667

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

2023 Bedford County Bridge Preservation
Infrastructure
Bidding
$2,500,000 CJ est. value
Bedford, PA 15522

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

PA 56 Pleasantville Mountain Safety Improvements
Infrastructure
Results
$2,500,000 to $4,999,999 est. value
PA

Plum Street Improvements Phase 7
Infrastructure
Results
$50,000 est. value

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

PA 56 - Rouzer Rd to SR 4030
Infrastructure
Design
$8,692,000 CJ est. value
Lincoln Township, PA 15521

Blacktop paving at the Everett Area Middle/High School Stadium
Infrastructure
Bidding
$304,000 CJ est. value
Everett, PA 15537

T-525 (Hammer Road) Over Adams Run
New Construction, Infrastructure
Post-Bid
$1,778,000 CJ est. value
Napier Township, PA 15559

Roadway and Miscellaneous Repairs
Infrastructure
Results

Last Updated 03/22/2023 01:08 AM
Project Title

US 30 Truck Study Turnaround

Physical Address View project details and contacts
City, State (County) Breezewood, PA 15533   (Bedford County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $716,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

On US 30 (Lincoln Highway) near the intersection of Thunder Rock Road in Brush Creek Township Fulton County. Primary Improvement Type: Safety Improvement As of March 22, 2023, the project is Future development stage. Anticipated letting date is January 09, 2025. PennDOT - US 30 Truck Study Turnaround *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents