Similar Projects
Gaffin Road SE Improvements - 0000253 - City of Salem
Infrastructure
Conception
$2,900,000 CJ est. value
Salem, OR 97317

West Salem Wastewater Pump Station Improvements - 0001063 - City of Salem
Renovation, Infrastructure
Conception
$22,510,140 CJ est. value
Salem, OR 97301

Region 2 (Central and South) Curve Warning Upgrades
Infrastructure
Design
$1,692,760 CJ est. value
Silverton, OR 97381

I-5: N. Santiam - Kuebler
Infrastructure
Design
$6,469,100 CJ est. value
Salem, OR 97317

Aircraft Factory
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Portland, OR 97232

North Marion Transfer Station Concrete Repair 2022
Infrastructure
Bidding
$900,000 CJ est. value
Woodburn, OR 97071

Pringle Elementary School
Addition, Demolition, Alteration
Post-Bid
Salem, OR

Water Improvements Pavement Repair
Infrastructure
Post-Bid
$250,000 CJ est. value
Detroit, OR 97342

Turner Lower Booster Pump Station
Renovation
Results
$750,000 est. value
Turner, OR 97392

Evans Haven
Infrastructure
Results
$1,935,000 CJ est. value
Gates, OR 97346

Water Street Mixed Use
New Construction, Infrastructure
Pending Verification
$2,700,000 CJ est. value
Silverton, OR 97381

Waldo Avenue Southeast/Wildwind Drive Southeast - Pipe Rehabilitation - 0000223 - City of Salem
Infrastructure
Conception
$2,650,000 CJ est. value
Salem, OR 97301

2022 Silverton Cured-in-Place Pipe (CIPP) Project
Infrastructure
Bidding
$500,000 CJ est. value
Silverton, OR 97381

2022 Project Work - Astoria, Forest Grove and Tillamook Districts
Infrastructure
Post-Bid
Salem, OR

Bill Riegel Park Phase 2 Site Improvements
Renovation, Infrastructure
Results
$350,000 to $450,000 est. value
Salem, OR 97317

Last Updated 08/22/2022 06:04 AM
Project Title

Ferry Street Pump Station Improvements - 0001064 - City of Salem

Physical Address View project details and contacts
City, State (County) Salem, OR 97301   (Marion County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $5,292,350 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design and construction for replacement of the Ferry Street Pump Station in a new, safer location outside of ODOT right-of-way. As of August 22, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents