Similar Projects
Coliseum Medical Centers Freestanding Emergency Department
New Construction, Infrastructure
Conception
$11,928,250 CJ est. value
Bonaire, GA 31005

Asbestos Abatements and Demolitions
Term Contract, Demolition, Infrastructure
Bidding
$250,000 CJ est. value
Warner Robins, GA 31088

Talton Road Widening
Infrastructure
Bidding
$400,000 CJ est. value
Perry, GA 31047

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Aquatic Center Site Work
Infrastructure
Post-Bid
$2,660,900 CJ est. value
Warner Robins, GA 31088

Design-Build and Design-Bid-Build Indefinite-Delivery Indefinite-Quantity Multiple Award Construction Contract for Naval Facilities Engineering Command Southeast Area of Operations N69450-20-R-0097
Results
$20,000,000 to $100,000,000 est. value

Sidewalk Work for Martin Luther King, Jr. Boulevard
Infrastructure
Results
$40,100 CJ est. value
Warner Robins, GA 31098

CRH Healthcare Shell Building / Bonaire
New Construction, Infrastructure - 4,000 SF
Construction
$800,000 CJ est. value
Bonaire, GA 31005

Bob White Storage Expansion / Perry
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$500,000 CJ est. value
Perry, GA 31069

Ashley Drive Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$93,000,000 CJ est. value
Perry, GA 31069

Waterline Extension to Serve Scott Road and Scott Road Extension
Infrastructure
Bidding
$300,000 CJ est. value
Elko, GA 31025

RFP Design - Perry DDA Downtown Lot
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Perry, GA 31069

Natural Gas System Replacement Regulator Stations 2, 3, and 4
Infrastructure
Results
$472,828 CJ est. value
Warner Robins, GA 31088

Jack Link's Manufacturing Faculty
New Construction, Infrastructure
Pending Verification
$450,000,000 CJ est. value
Perry, GA 31069

RFP Construction Manager at Risk - East Perry Wastewater Treatment Facility Phase I
New Construction, Infrastructure
Post-Bid
$50,000,000 CJ est. value
Perry, GA 31069

Last Updated 08/28/2023 01:01 AM
Project Title

Install Construct Breakroom and Administrative Area Building 125

Physical Address View project details and contacts
City, State (County) Robins AFB, GA 31098   (Houston County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $12,334,935 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Aug 24, 2023 Contract Award Number: W912HN23C3003 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: VRAHG9BDXCP9 Contractor Awarded Name: 4K GLOBAL-ACC JV LLC Contractor Awarded Address: Augusta, GA 30907 USA Base and All Options Value (Total Contract Value): $12,334,935.00 An amendment is being drafted in response to the ProjNet RFIs. The amendment will extend the bid due date to 13 July 2023 at 11:00 AM. Amendment 0007 is anticipated to be posted to SAM/PIEE no later than 29 June 2023. Amendment 0006- Extend bid due date to 29 June 2023 at 1:00 PM. Amendment 0005- Post site visit sign in sheet. Amendment 0004- Resume IFB. Updated specs and drawings posted. New site visit date. Amendment 0003- Postpone the solicitation due date indefinitely. Amendment with new bid due date is anticipated in January 2023. Add clauses FAR 52.219-1 Alt 1 and FAR 52.232-18. Amendment 0002- Updated specifications posted. Amendment 0001- Post site visit sign in sheet data. Added two reports for informational purposes. This solicitation is for FY 23 PN UHHZ180037 Install Construct Breakroom and Administrative Area in Building 125, Robins AFB, GA. This acquisition will be a total small business set-aside, an invitation for bid, and will result in a Firm Fixed Price Contract Award. Description/Scope: Robins AFB has a requirement for the construction of a breakroom and administrative area within the northeast annex of Building 125. The work includes construction of a new second floor structure with kitchen, snack bar and dining area on the first floor and administrative area on the new second floor. The existing freight elevator shall be removed and replaced with a new passenger elevator. An existing exterior stairway shall be demolished and replaced with a new stairway. Mechanical, electrical, fire suppression, fire alarm and communications systems are included and incidental related work. Period of Performance: 18 Months In accordance with DFARS 236.204(ii), the magnitude of construction for this project is between $10,000,000 and $25,000,000. Evaluation Criteria: The contract will be solicited and procured via FAR Part 14, Sealed Bidding Procedures. Notes: 1. The solicitation will be issued in electronic format only. Please note that the bid opening date is specified in the Solicitation. No additional media (CDROM, floppy disk, faxes, etc.) will be provided. Any prospective Offeror must register in the System for Award management (SAM) at www.sam.gov which is now all inclusive for also registering in order to obtain solicitation documents, plans and specifications for this solicitation. It is the Offeror's responsibility to check the internet address provided as necessary for any amendments that may be posted to this solicitation. Paper copies of this solicitation will not be available. Other methods of requesting a package will not be honored. 2. One or more of the items under this acquisition is subject to Trade Agreements and Buy American statute in FAR Part 25. 3. Project is listed on PIEE. Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronically via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/. 4. Site Visit: An organized site visit is scheduled for 31 May 2023 at 09:30 AM. Contractors will meet at the Robins AFB Visitor's Center. Contractors interested in attending the site visit need to email Christopher Spencer (Christopher.L.Spencer@usace.army.mil) with the names of all attendees no later than 25 May 2023. The Government cannot guarantee that requests sent after 25 May 2023 will be processed in time to allow access to site.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents