Similar Projects
Area at Ave E and Ave H (Ferguson Park District) - City of Temple
Infrastructure
Conception
$1,300,000 CJ est. value
Temple, TX 76501

Jones Park Renovations (Midtown District) - City of Temple
Renovation, Infrastructure
Conception
$1,000,000 CJ est. value
Temple, TX 76504

Burbank High School - 2020 Bond - Category 2 - San Antonio Independent School District (SAISD)
New Construction, Renovation, Infrastructure
Design
$19,318,760 CJ est. value
San Antonio, TX 78205

SOFTBALL FIELD UPGRADE
Infrastructure
Design
$300,000 CJ est. value
San Antonio, TX 78224

US0287 - Mill and Inlay
Infrastructure
Bidding
$4,708,983 CJ est. value
Tennessee Colony, TX 75861

Construct New Facility
New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Fort Hood, TX 76544

IH0035 - Installation of Flashing Beacons and Ped
Infrastructure
Sub-Bidding
$2,925,000 CJ est. value
San Antonio, TX 78208

Tommy Car Wash Systems
New Construction, Infrastructure - 5,371 SF
Sub-Bidding
$3,000,000 CJ est. value
Killeen, TX 76549

Valvoline Instant Oil Change
New Construction - 2,080 SF
Post-Bid
Schertz, TX 78154

Take 5 Oil Change
New Construction - 1,462 SF
Post-Bid
Less than $500,000 CJ est. value
Belton, TX 76513

Thea Meadows Unit 4 Subdivision
Results
San Antonio, TX 78275

Paso Del Norte Street (Shady Oaks)
Infrastructure
Results
$1,579,900 est. value
San Antonio, TX 78232

All Star Autoplex
Renovation - 11,000 SF
Construction
Palestine, TX 75801

Take 5 Oil Change
New Construction - 1,430 SF
Construction
$800,000 est. value
Killeen, TX 76549

Nicha's Comida Mexicana
New Construction, Infrastructure - 7,805 SF
Pending Verification
$2,000,000 CJ est. value
San Antonio, TX 78214

Last Updated 08/26/2022 09:36 AM
Project Title

Toyota of Wichita Falls

Physical Address View project details and contacts
City, State (County) Wichita Falls, TX 76310   (Wichita County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $9,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: car dealership Construction documents are complete and building permits are expected to be issued in mid-April 2022. A general contractor has been selected.

Details

30,999 SF.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents