Similar Projects
El Creston MDWCA Water System Improvements Project
Post-Bid
Las Vegas, NM 87701

Alcalde MDWCA Water System Improvements
Post-Bid
$371,873 est. value
Alcalde, NM 87511

Valle Del Rio Water System Improvements
Results
La Mesa, NM

Aveh Poe Drainage Crossing and Nambe Plaza Drainage
Results
Pueblo of Acoma, NM 87506

Drainage Crossing Improvements
Post-Bid
Cimarron, NM 87714

Reconstruction Of The Sandoval Ditch Irrigation Water Delivery System (Phase I)
Results
Less than $750,000 est. value
Pueblo of Acoma, NM

Concrete Check and Turnout Structures
Post-Bid
Mora, NM 87732

Drainage and Roadway Improvements Ridge Road - Phase 1
Results
Silver City, NM 88061

Installation of Livestock Well, Livestock Pipeline, Drinking Troughs, Storage Tank and Solar Pumping Plant
Post-Bid
Hernandez, NM 87537

Water System SCADA Improvements
Results
$616,100 est. value
Santa Rosa, NM 88435

Phase 2 Water System Improvements
Post-Bid
El Prado, NM 87529

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Mirabal Park Multipurpose Flood Control Facility
Post-Bid
Milan, NM 87021

Construction of 6-inch PVC Water Main and associated Appurtenances, Mescalero Apache Reservation, New Mexico.
Results
$500,000 to $1,000,000 est. value
Mescalero, NM 88340

On Call Construction Services for Public Works
Term Contract
Post-Bid
Less than $2,500,000 est. value
Los Alamos, NM 87544

Last Updated 12/16/2021 01:26 PM
Project Title

Acequia De La Isla Acequia De La San Jose Diversion Rehabilitation Project

Physical Address View project details and contacts
City, State (County) NM   (Mora County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $104,208
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work includes the following: excavation and placement of compacted backfill (100 CY balanced onsite), furnish and install 100 cubic yards of Class ā€˜Cā€™ Riprap, furnish and install water control gates and steel irrigation heading structure, furnish and install 20 linear feet of 24ā€ diameter CMP sluice pipe with an end section, salvage and reinstall 20 linear feet of 48 inch diameter CMP at road crossing, furnish and install 20 linear feet of 12 inch diameter CMP at road crossing, furnish and install 14 feet farm gate with posts, and 100 square yards of seeding and stabilization.

Details

Division 31 - Earthwork, Excavation and Fill, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents