Similar Projects
Route 82 Safety Improvement Phase 2 - Connecticut Department of Transportation
Infrastructure
Conception
$20,400,000 CJ est. value
Norwich, CT 06360

West Main Street Watermain Replacement - Norwich Public Utilities
Infrastructure
Conception
$8,000,000 est. value
Norwich, CT 06360

National Coast Guard Museum
New Construction, Infrastructure - 80,000 SF
Design
$100,000,000 CJ est. value
New London, CT 06320

Breeze Car Wash
Demolition, New Construction, Infrastructure - 3,050 SF
Design
$700,000 CJ est. value
Waterford, CT 06385

New London Community Recreational Center
New Construction, Infrastructure - 57,000 SF
Bidding
$15,000,000 CJ est. value
New London, CT 06320

P1097 Relocate Underwater Electromagnetic Measurement System, Naval Submarine Base New London
Infrastructure
Bidding
$25,000,000 CJ est. value
Groton, CT 06340

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

National Coast Guard Museum (NCGM) - Bulkhead and Fill
Infrastructure
Post-Bid
$1,000,000 CJ est. value
New London, CT 06320

Water Street at Ferry Street and Governor Winthrop Boulevard Traffic Signal Improvements
Infrastructure
Results
$891,405 CJ est. value
New London, CT 06320

Runway 6/15 - Off Airport Obstruction Removal Bradley International Airport
Infrastructure
Results
$1,891,750 CJ est. value
Windsor Locks, CT 06096

The Great Wolf Lodge at Mashantucket
Demolition, New Construction, Infrastructure - 90,000 SF
Construction
$300,000,000 CJ est. value
Ledyard, CT 06338

Oswegatchie Hills Affordable Housing
New Construction, Infrastructure
Pending Verification
$317,000,000 CJ est. value
East Lyme, CT 06333

Parking Lot - New London Board of Education
Infrastructure
Pending Verification
$500,000 CJ est. value
New London, CT 06320

Route 82 Safety Improvement Phase 1 - from Banas Court to Fairmont Street, City of Norwich - Connecticut Department of Transportation
Infrastructure
Conception
$20,000,000 CJ est. value
Norwich, CT 06360

Reid and Hughes Building Renovation
Demolition, Infrastructure, Build-out, Renovation
Design
$7,100,000 CJ est. value
Norwich, CT 06360

Last Updated 03/28/2023 03:11 PM
Project Title

Rose Alley Force Main Permanent Repair

Physical Address View project details and contacts
City, State (County) Norwich, CT 06360   (New London County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 28, 2023 Norwich Public Utilities has decided not to pursue this project at this time.NPU reserves the right to re-advertise this project in the future. Norwich Public Utilities reserves the right to reject any and all bids, in whole or in part, to waive minor irregularities in the bidding and to award the bid to other than the low bidder if deemed in the best interest of the City of Norwich. No Bidder may withdraw its bid within sixty (60) days of the bid opening date. Should there be reason why the contract cannot be awarded within the specified time, the time may be extended by mutual agreement between Norwich Public Utilities and the designated, qualified low bidder. All final awards of the bid shall be in compliance with the City of Norwich Code of Ordinances 7-46 - Delinquent Tax Setoff Against Money Due Bidder or Contractor. Responding bidders must ensure that employees and applicant for employment are not discriminated against because of their race, color, religious creed, age, marital status, national origin, ancestry, sex, gender identity or expression, intellectual disability, mental disability or physical disability, including, but not limited to blindness, unless it is shown by such bidder that such disability prevents performance of the work involved. The Successful Bidder will be required to comply with the following requirements: a) Furnish the additional bonds and insurance prescribed in the Bidding Documents.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents