Similar Projects
2" Flexible Conduit
Post-Bid
Fort Collins, CO 80521

HDPE Culvert Liner
Post-Bid
Wellington, CO 80549

PN 338 Culvert No. 74E-8.5-68C Repair
Results
CO

Velocity Metropolitan District Number 1 Porteos Phase 6 Segment 2
Results
CO

Timnath Reservoir Shoreline Improvements
Post-Bid
Less than $500,000 est. value
Timnath, CO

Eagle Brook Meadows Second Subdivision - Public Infrastructure
Results
Less than $1,525,807 est. value
Loveland, CO

Vault, Secondary Splice Box
Post-Bid
Fort Collins, CO

Garfield Harrison Storm Drainage Improvements Project
Results
Loveland, CO

Mrs. Walsh`s Garden Pond/Waterfall Reconstruction
Post-Bid
Estes Park, CO 80517

On-Call and Emergency Sediment/Debris Removal
Term Contract
Results
Berthoud, CO

Reinforced Concrete Pipe
Term Contract, Infrastructure
Post-Bid
Fort Collins, CO

East Troublesome Fire Recovery EWP Heavy Civil CMGC
Infrastructure
Results
Berthoud, CO

Kinston Millennium East 15th and 16th Subdivision
Infrastructure
Post-Bid
Loveland, CO

Cameron Peak Emergency Response Culvert Replacement
Infrastructure
Results
Less than $1,000,000 est. value
CO

Swim Beach Shoreline Stabilization
Infrastructure
Results
Less than $200,000 est. value
Fort Collins, CO

Last Updated 01/28/2022 11:49 AM
Project Title

Kitchel Lake Filing 3 Infrastructure Project

Physical Address View project details and contacts
City, State (County) Timnath, CO   (Larimer County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project generally includes the purchase and installation of the following: all project infrastructure, including: site excavation and grading, site demolition, potable water system, sanitary sewer system, storm sewer system, subdrain/underdrain system, concrete walk ways, soft surface trails, sidewalks, curb and gutter, local, collector, and arterial roadways, erosion control, as detailed on the provided bid tab. Project location is the corner of Prospect Road and Larimer Ridge Parkway in Timnath, CO 80547.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents