Similar Projects
Movement School East
Addition
Conception
Charlotte, NC 28212

Hope Montessori School
New Construction - 2,382 SF
Conception
$500,000 to $1,000,000 CJ est. value
Matthews, NC 28104

York Elementary
Design
NC

Denver Christian Academy
Addition - 4,226 SF
Design
Denver, NC 28037

New Addition at Mount Pleasant Elementary School
Addition
Bidding
$6,000,000 est. value
Mount Pleasant, NC 28124

New Pk-12 School
New Construction
Bidding
$57,981,281 est. value
Plymouth, NC 27962

New Elementary School Windsor Park, Winterfield, Idlewild Relief Roofing and Accessories
New Construction - 105,000 SF
Sub-Bidding
$37,197,022 est. value
Charlotte, NC

E-41 Apex Friendship Elementary School
New Construction - 129,790 SF
Post-Bid
Apex, NC 27502

Lansdowne Elementary School
New Construction - 204,000 SF
Post-Bid
Charlotte, NC 28270

Knightdale Elementary School Park
Results
Knightdale, NC 27545

Modular Classroom Building at Parkwood Elementary School
Results
Durham, NC 27713

Crosscreek Charter School
New Construction - 39,000 SF
Construction
$5,955,000 est. value
Louisburg, NC

Thales Academy at Chatham Park
New Construction - 54,284 SF
Construction
$4,092,533 est. value
Pittsboro, NC 27312

Administrative Office Renovations
Renovation
Conception
Charlotte, NC 28217

Wilderness Campus
New Construction - 34,586 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Fletcher, NC

Reported 03/03/2022 12:00 AM
Project Title

Hunter Elementary School Renovation

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27407   (Guilford County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect - 02/01/22
Owner View project details and contacts
Architect View project details and contacts
Description

Work in the project follows: The location is an existing 1 story office building with a basement. Scope of work on the basement level is contained to the existing boiler and mechanical rooms. 1st floor work includes but not limited to demo and replacement of existing interior walls, flooring, casework, ceiling, MEP. Exterior work includes replacement of existing downspouts and gutters, soffit repairs and cleaning, roof repairs, sealant, and general exterior cleaning.

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents