Similar Projects
New Elementary School - Clovis Unified School District
New Construction, Infrastructure
Conception
$40,000,000 CJ est. value
Clovis, CA 93619

Pilibos Improvements - PC00185 - City of Fresno
Infrastructure
Conception
$910,200 CJ est. value
Fresno, CA 93727

Lakeshore Stewardship IRSC
Infrastructure
Design
$150,000 CJ est. value
Prather, CA 93651

Divine Mercy Catholic Church
New Construction, Infrastructure - 49,100 SF
Design
$16,000,000 CJ est. value
Clovis, CA 93619

California Conservation Corps (CCC) Auberry Residential Center - CA Department of General Services
Addition, Demolition, New Construction, Build-out, Infrastructure
Post-Bid
$52,000,000 CJ est. value
Auberry, CA 93602

New Kerman Elementary School
Infrastructure
Post-Bid
$20,000,000 est. value
Kerman, CA

American Avenue Disposal Site Phase I Waste Relocation
Infrastructure
Results
$22,477,777 CJ est. value
Kerman, CA 93630

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

The Arthur at Blackstone
New Construction, Infrastructure - 14,000 SF
Construction
$24,000,000 CJ est. value
Fresno, CA 93703

Harris Ranch Beef Company Expansion
New Construction, Infrastructure - 275,898 SF
Pending Verification
$185,000,000 CJ est. value
Selma, CA 93662

Harris Ranch Beef Company Expansion
New Construction, Infrastructure - 275,898 SF
Pending Verification
$185,000,000 CJ est. value
Selma, CA 93662

South Tower Park - PC00204 - City of Fresno
Infrastructure
Conception
$2,071,000 CJ est. value
Fresno, CA 93721

Pistachio Processing Expansion - Lanare
Addition, Demolition, Renovation, Infrastructure
Design
$2,000,000 CJ est. value
Riverdale, CA 93656

Low-NOx Flare at the Clovis Landfill
Infrastructure
Post-Bid
$175,000 CJ est. value
Clovis, CA 93612

Sanitary Sewer Pipeline Rehabilitation on Gettysburg Street Between First and Fresno Streets
Infrastructure
Results
$571,020 CJ est. value
Fresno, CA 93722

Last Updated 09/07/2023 12:35 AM
Project Title

Concrete Liner Installation at the Northeast Surface Water Treatment Facility (NESWTF) Sludge Drying Beds 1 and 2

Physical Address View project details and contacts
City, State (County) Fresno, CA 93720   (Fresno County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $3,800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes, but is not limited to, installation of concrete liner at the existing NESWTF sludge drying beds 1 and 2.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents