Similar Projects
21st Avenue and 42nd Street Resurfacing
Post-Bid
Kenosha, WI

Repaving 308th Avenue
Post-Bid
$234,000 est. value
Kansasville, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Dump Station Reconfiguration/Relocation GPC
Renovation
Results
Kansasville, WI

2021 Village Seal Coating Program
Infrastructure
Post-Bid
Salem, WI

Lake Geneva - Kenosha, CTH O - STH 75, 236th Avenue - 125th Avenue
Results
Kenosha, Lake Geneva, WI

2022 Paving Program Utility Adjustment and Curb Repair
Infrastructure
Post-Bid
WI

2021 Paving Program Phase 1
Results
Pleasant Prairie, WI

2022 Paving Program Phase 1
Term Contract, Infrastructure
Post-Bid
Pleasant Prairie, WI 53158

2021 Paving Program - Phase II
Results
$480,000 est. value
Pleasant Prairie, WI

54th Avenue and 56th Avenue Resurfacing
Infrastructure, Alteration
Post-Bid
$400,000 est. value
Kenosha, WI

18th Avenue Reconstruction - 18th Street to Madison Road
Renovation
Results
Kenosha, WI 53140

Joint, Crack Cleaning and Sealing
Infrastructure
Post-Bid
$120,000 est. value
Kenosha, WI

2021 Street Improvements
Results
Salem, WI

Crack Filling, Pavement, Pavement Wedging and Sealcoating on Various Roads
Infrastructure
Post-Bid
$400,000 est. value
Bristol, WI

Reported 06/16/2022 08:42 AM
Project Title

109th Avenue Roadway Improvements - Village of Pleasant Prairie

Physical Address View project details and contacts
City, State (County) Pleasant Prairie, WI 53158   (Kenosha County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

complete scope of work has not been disclosed. As of June 15, 2022, this project is in the conceptual phase. The owner has plans to select an engineer in 2022. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2023.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents