Similar Projects
Redfern Properties High Rise Apartments
New Construction - 180,000 SF
Conception
$5,000,000 to $10,000,000 est. value
Portland, ME

Starbucks Redevelopment
New Construction - 9,400 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Bangor, ME 04401

O'Reilly Auto Parts #6214 (YOR)
New Construction - 6,800 SF
Design
$500,000 to $900,000 est. value
York, ME

Saco Street Mixed Use
New Construction
Design
$8,000,000 to $9,000,000 est. value
Westbrook, ME 04092

Rachel Carson Multi-Purpose Facility
Addition, Demolition, New Construction, Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Kennebunk, ME 04043

The Mark at Cumberland Foreside
New Construction, Infrastructure - 64,795 SF
Bidding
$18,000,000 CJ est. value
Cumberland Foreside, ME 04110

Walmart Supercenter #2013-250 - CSP
Renovation - 204,700 SF
Post-Bid
Waterville, ME 04901

Maine Appalachian Trail Club
Alteration
Post-Bid
Skowhegan, ME 04976

Scattered Sites Redevelopment Construction Manager at Risk
Infrastructure
Results
$1,100,000 est. value
Portland, ME

Sea Wall Rehabilitation and Betsy's Cove Site Improvements
Infrastructure
Results
Brooksville, ME 04617

Hobson's Landing - Master Plan - Phase 1&2
New Construction - 490,508 SF
Construction
$10,000,000 CJ est. value
Portland, ME 040101

Large Culvert Replacement - Patten - Region 5
Infrastructure
Construction
$484,482 CJ est. value
Patten, ME 04765

Summit Community Church
New Construction, Infrastructure - 28,000 SF
Pending Verification
$8,000,000 CJ est. value
Gorham, ME 04038

Broadway Marijuana Retail
Renovation - 3,500 SF
Pending Verification
Bangor, ME 04401

Kennebec Historical Society Expansion
Addition, Demolition, Renovation, Infrastructure
Conception
$250,000 CJ est. value
Augusta, ME 04330

Last Updated 09/02/2022 12:04 PM
Project Title

57 Recycle Drive Lot 3

Physical Address View project details and contacts
City, State (County) Topsham, ME 04086   (Sagadahoc County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Retail, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $5,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The sketch plan was presented to the Topsham Planning commission August 2022. Information regarding contractor has yet to be determined. Although a firm timeline has yet to be announced, construction is estimated to begin fourth quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

20,585 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents