Similar Projects
Vacancy Unit Turn at Houston Moore
Post-Bid
Wilmington, NC 28401

Interior Painting of Fire Headquarters
Post-Bid
Wilmington, NC

Office Partition Installation
Results
Sneads Ferry, NC 28460

Window and Wall Repairs
Results
Less than $287,000 est. value
Elizabeth City, NC

Samarcand Training Academy - Phase 2 - Tufts Building
Construction
Eagle Springs, NC 27242

Vacancy Unit Turns/Painting of Vacant and/or Occupied Units Authority Wide
Post-Bid
Wilmington, NC

Painting Restoration Project for Several Schools - Phase II
Results
Fayetteville, NC

Painting Services
Post-Bid
Asheville, NC

Exterior Painting - Guy Smith Stadium
Results
Greenville, NC

Piedmont Triad Airport Residential Sound Insulation, Phase 7
Post-Bid
Greensboro, NC 27400

Courthouse Sheetrock Replacement and Repairs
Results
Beaufort, NC

Cordelia Camp Backfill - Admissions to HFR 1st Floor Upfit - Paneling and Ceilings
Post-Bid
Cullowhee, NC 28723

Weaver Court 5 Dwelling Unit Cleanup
Results
Lumberton, NC

North Carolina State Capitol Building Improvements
Post-Bid
Raleigh, NC

NCMA FT BRAGG Painting Buildings and 6 Billets
Results
Less than $198,462 est. value
Fort Bragg, NC 28307

Last Updated 11/30/2018 02:12 PM
Project Title

Superior 1 Sheetrock Repair and Paint

Physical Address View project details and contacts
City, State (County) Beaufort, NC 28516   (Carteret County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior, Painting
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description Details are as follows: 1. Prep and paint all of Superior 1 Courtroom, Jury Room 1, Jury Room 2, Hallway and top of stairwell to match existing colors. 2. Repair hole in ceiling in Judges Chambers and paint ceilings within. 3. Repair any damaged areas as needed. Walls are to be smooth and clean. 4. Any damage associated with this project is the contractor's responsibility. 5. Moving of all materials, equipment and all cleaning are to be handled by the contractor. 6. MSDS and SDS must be submitted to County prior to any work being performed. 7. Materials/paint is to be applied evenly by brush or roller without runs, drips, air bubbles or other defects.
Details
Division 09 - Finishes, Painting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents