Similar Projects
Apex Center North Roof Replacement
Bidding
Arvada, CO 80005

Bicentennial Art Roof Recover
Bidding
Aurora, CO 80012

AFB 2141 CC 2018 Hail Damage Repairs
Post-Bid
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

Boulder Water Resource Recovery Facility Roofing Replacement Project
Post-Bid
Boulder, CO 80301

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Heritage Park Restroom Renovation/Cleo Mudrock Baseball Dugout Roofing Project
Renovation
Construction
Less than $125,000 est. value
Louisville, CO 80027

Emergency Roof Shoring
Construction
Palmer Lake, CO 80133

Aurora Center for Active Adults Roof Recover
Bidding
Aurora, CO 80011

Heritage Park Restroom Renovation and Cleo Mudrock Dugout Roofing
Renovation
Post-Bid
Louisville, CO 80027

Detention Center Roof G
Results
$100,000 to $150,000 est. value
Broomfield, CO 80021

Facilities Building K
Bidding
Aurora, CO 80012

Roofing Projects
Post-Bid
Brighton, CO 80601

Tent Roof Maintenance and Repair
Results
Denver, CO

Westerly Creek Deck Roof Replacement
Post-Bid
Denver, CO 80223

Last Updated 04/20/2021 03:23 PM
Project Title

KFL-EPC Roof Replace

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80918   (El Paso County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for the replacement of the existing roofing at the UCCS Kramer Family Library & El Pomar Center building. The existing roofing area consists of multiple areas and is approximately 62,966 sf. Scope of Services The UCCS University roofing standards will be utilized as a basis of design, including a 15-year roofing warranty (20 year as an add alternate). The partial removal of the existing lightning protection system and new certified design & reinstallation of the replacement lightning protection system is included within the scope of work. Refer to the Construction Documents for a complete scope of work/services.

Details

Division 02 - Existing Conditions.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes.
Division 22 - Plumbing.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents