Similar Projects
Scheduled and Emergency Mechanical and Millwright Services At Various Locations
Alteration
Bidding
$880,080 est. value

Mechanical Prime Project
Alteration
Bidding
$260,000 est. value
Ayer, MA

National Board of Boiler and Pressure Vessel Inspectors
Alteration
Post-Bid
$160,000 est. value
Tewksbury, MA 01876

Boiler Inspection
Term Contract
Post-Bid
Hanscom A F B, MA

Boiler Replacement at the Watertown Middle School - General Bid
Results
Less than $1,100,000 est. value
Watertown, MA 02472

Heating System Distribution Pump and Selected Piping Replacement at Prospect Terrace 200-1
Results
$256,000 est. value
Waltham, MA 02451

Upgrade to the Honeywell Building Management
Alteration
Bidding
$85,000 est. value
Dracut, MA 01826

Chiller Controls
Term Contract
Post-Bid
MA

Replacement of Boiler Valve
Results
$19,500 est. value
Framingham, MA

Hot Water Boiler Replacement and HVAC Controls Upgrade
Alteration
Bidding
$700,000 est. value
Hopkinton, MA 01748

USACE D/B B42 Replace Failing Boiler System
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Natick, MA 01760

Page Hilltop School Boiler and UV Replacement - General Bids
Results
$350,000 est. value
Ayer, MA 01432

Replace Tankless Hot Water Heater
Alteration
Bidding
$57,000 est. value
Marlborough, MA 01752

USACE D/B B42 Hypobaric Envirovac Waste System, Natick, MA
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value
Natick, MA 01760

Page Hilltop School Boiler and UV Replacement - Filed Sub Bids
Results
Ayer, MA 01432

Last Updated 04/08/2022 03:44 PM
Project Title

H345--Boiler Plant Controls Calibration and Testing Services.

Physical Address View project details and contacts
City, State (County) Bedford, MA 01730   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide all labor, tools, testing equipment and supplies required for semi-annual calibrations of Boiler plant controls and instrumentation for three boilers and other plant equipment. Contractor shall have a laptop computer and required software to plug into & back-up all settings in the PCCIII controls and provide a back-up flash drive to Plant Supervisor. Contractor shall not be accessing any Sensitive VA Information Systems; these are boiler controls only. Control devices will include but are not limited to the following, Preferred Instruments, CB Hawk, Foxboro, Yokogawa, Siemens & Johnson Controls.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Boilers, Specialty Process Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents