Similar Projects
West Annex Building Bio-Safety Improvements
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Albany, CA 94710

Temporary Portable Chiller System Rental Services
Alteration
Bidding
$5,040,000 est. value
Calipatria, CA 92233

City Hall Mechanical Replacement Project Phase II
Term Contract
Bidding
$5,895,000 est. value
San Francisco, CA

Sources Sought for Mechanical Repairs in CA RO
Term Contract
Post-Bid
Richmond, CA

Boiler Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

EMS Upgrades at the Main Library
Alteration
Results
$347,500 est. value
Burlingame, CA 94010

North Bay Regional Water Treatment Plant Chiller Replacement for O-Zone Generator
Alteration
Bidding
Fairfield, CA 94533

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

Gate Opener Replacement Project for Police District Substations 1 and 2
Alteration
Results
$32,000 est. value
Visalia, CA 93291

Job Order Contract - Mechanical
Alteration
Post-Bid
Clovis, CA

SJC On-Call Mechanical Contract 21-22
Alteration
Results
$1,000,000 est. value
San Jose, CA 95110

44--Option - Boiler Inspection
Term Contract
Post-Bid
Petaluma, CA 94952

Orchard Dale Elementary School Modernization Project- Mechanical
Alteration
Results
Whittier, CA 90603

Boiler Maintenance Services
Term Contract
Post-Bid
CA

Last Updated 03/23/2022 11:32 AM
Project Title

Z--Mechanical Repairs

Physical Address View project details and contacts
City, State (County) Richmond, CA 94801   (Contra Costa County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SSA requires replacement and repair of various parts of critical mechanical equipment used within the building to ensure continued operation. SSA also requires creation of a bypass loop on a condenser line to allow for routine maintenance of the system without requiring a system shut down. The period of performance is one year from the date of contract award.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents