Similar Projects
Last Updated | 04/02/2023 07:31 AM |
Project Title | Replace Roofs - 4 Buildings |
Physical Address | View project details and contacts |
City, State (County) | Moberly, MO 65270 (Randolph County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $785,104 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work consists of furnishing all labor, materials, equipment and services to remove and replace the roof systems (including repair and replacement of deteriorated roof deck, new insulation, flashings, trims, fasteners, roof accessories and all other components required to make a complete weathertight installation) of the Recreation/Connector & Gymnasium Building No. 7 (two buildings), Chapel Building No. 9, and the Sign Shop Building No. 14 MBE/WBE/SDVE Goals: MBE 10%, WBE 10%, and SDVE 3%. NOTE: Only MBE/WBE firms certified by the State of Missouri Office of Equal Opportunity as of the date of bid opening, or SDVE(s) meeting the requirements of Section 34.074, RSMo and 1 CSR 30-5.010, can be used to satisfy the MBE/WBE/SDVE participation goals for this project. The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20 working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |