Similar Projects
Last Updated | 09/19/2022 10:08 AM |
Project Title | Construction of Schreiber Foods Water Main Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Amalga, UT 84335 (Cache County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development, Water Lines |
Contracting Method | Bids by Invitation |
Project Status | Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $546,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Description of Work: The Project generally includes removing and replacing in-situ approximately 4,420-feet of existing 6-inch water main with 8-inch C900 PVC pipeline from the Schreiber Foods pump station to the Schreiber Foods source water connection, removal and replacement of water meter and chlorine injection assemblies and vaults, removal and replacement of Schreiber Foods booster pump system and piping assembly, and all work required therewith to construct the project complete as to form and function. Bid Security: Bid security, which must be on the Bid Bond form provided with the Construction Documents or on approved Bid Bond documents provided by the Bonding Agency, in the amount of five percent (5%) of the bid, made payable to Schreiber Foods, shall accompany the bid. A certified or cashiers check may be used for the bid bond. Project Administration: All questions relative to this project prior to the opening of bids shall be directed to the Engineer for the project, and all questions shall be in writing. For or equal items to be considered for evaluation, Contractor must submit information in compliance with the Instructions to Bidders. No clarifications or questions will be answered three (3) days prior to bid date. Owners Rights Reserved: Schreiber Foods reserves the right to reject any or all bids and to waive any formality or technicality in any bid. Final quantities and project work portions will be dependent upon bids and the final project budgets. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |