Similar Projects
West 22nd Street North Self Storage
New Construction - 36,500 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Wichita, KS 67203

Kansas Commerce Center
New Construction - 142,500 SF
Design
$10,000,000 CJ est. value
Lenexa, KS 66219

Titan Realty Warehousing
New Construction
Design
Wichita, KS 67212

RFP D/B - Federal Correctional Institute (FCI) - City of Leavenworth
New Construction, Infrastructure
Bidding
$300,000,000 CJ est. value
Leavenworth, KS 66048

Ulysses Airport - Rehabilitate Runway 17-35
Infrastructure
Bidding
$500,000 CJ est. value
Ulysses, KS 67880

Lighting
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Lacey, KS 67701

Signing
Infrastructure
Sub-Bidding
$3,000,000 CJ est. value
Lucas, KS 67648

Great Bend Police Station and Court Facility
New Construction, Infrastructure
Post-Bid
$8,000,000 CJ est. value
Great Bend, KS 67530

Odor and Corrosion Control Services
New Construction
Post-Bid
Wichita, KS

Defoamant - Kaw Point Treatment Plant
New Construction
Results
Kansas City, KS

Wastewater Treatment Plant Aeration Blower Replacement
Renovation
Results
Wamego, KS

Sunflower Commerce Park f/k/a Bel Aire Warehouse & Office
Renovation - 25,780 SF
Construction
Bel Aire, KS 67226

Public Storage
New Construction - 115,134 SF
Construction
$10,000,000 CJ est. value
Lenexa, KS 66215

175Th Commerce Centre
New Construction - 1,066,240 SF
Pending Verification
$10,000,000 CJ est. value
Olathe, KS

Hans Rudolph Warehouse
Addition - 6,720 SF
Pending Verification
Lenexa, KS 66227

Last Updated 08/11/2022 08:06 AM
Project Title

Water Treatment Plant Improvements

Physical Address View project details and contacts
City, State (County) Belleville, KS 66935   (Republic County)
Category(s) Commercial, Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $3,498,213 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Water Treatment Plant Improvements including a new Ion Exchange Nitrate Removal Water Treatment Plant (the Ion Exchange equipment has already been procured by the City but will be installed by the Contractor), a new 40' x 60' pre-engineered metal building, a new 30' x 40' (120,000 gallon) concrete clear well with vertical turbine high service pumps, approximately 6700' of 6" Class 200 PVC Pipe, approximately 5000' of 3" Class 160 PVC, two 0.4 acre synthetic lined evaporative lagoons, site work, electrical work, a new backup generator, miscellaneous site and building piping and miscellaneous appurtenances. Direct all questions to Keithen Meyer at 785.539.4687 or kmeyer@schwab-eaton.com Project No. C21G0971

Details

Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents