Similar Projects
St. Thomas Island Drive - Beresford Creek Crossing - City of Charleston
Infrastructure
Conception
$751,467 CJ est. value
Charleston, SC 29492

St. Thomas Island Drive - Beresford Creek Crossing - City of Charleston
Infrastructure
Conception
$751,467 CJ est. value
Charleston, SC 29492

Baker Motors - Alfa Romeo, Maserati and Rolls Royce Dealership
Demolition, New Construction, Infrastructure - 11,240 SF
Design
$5,000,000 CJ est. value
Charleston, SC 29407

Baker Motors - Alfa Romeo, Maserati and Rolls Royce Dealership
Demolition, New Construction, Infrastructure - 11,240 SF
Design
$5,000,000 CJ est. value
Charleston, SC 29407

BCSO Auxiliary Building Construction
New Construction, Infrastructure - 2,400 SF
Bidding
$500,000 CJ est. value
Moncks Corner, SC 29461

2022 CTC Local Road Resurfacing
Infrastructure
Bidding
$500,000 CJ est. value
Moncks Corner, SC 29461

Valvoline Oil Change - Foxbank / Moncks Corner
New Construction, Infrastructure - 2,091 SF
Sub-Bidding
$800,000 CJ est. value
Moncks Corner, SC 29461

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Proposed Mitigation Plans for SC-91 (Berlin Myers Parkway) Phase 3
Infrastructure
Post-Bid
$200,000 CJ est. value
Summerville, SC 29483

Road Work - 2021 Resurfacing Plan TST
Infrastructure
Results
$2,824,814 est. value
Charleston, SC

Road Work - Town of Mount Pleasant 2020 Microsurfacing Plan
Infrastructure
Results
Charleston, SC

Southern Eagle Expansion
Addition, Demolition, Infrastructure
Construction
$3,000,000 CJ est. value
Charleston, SC 29492

Southern Eagle Expansion
Addition, Demolition, Infrastructure
Construction
$3,000,000 CJ est. value
Charleston, SC 29492

St. Andrews Mixed Use Development
New Construction, Infrastructure - 11,400 SF
Pending Verification
$25,000,000 CJ est. value
Charleston, SC 29407

St. Andrews Mixed Use Development
New Construction, Infrastructure - 11,400 SF
Pending Verification
$25,000,000 CJ est. value
Charleston, SC 29407

Last Updated 01/13/2023 09:33 AM
Project Title

Rehabilitation - Berkeley County

Physical Address View project details and contacts
City, State (County) Moncks Corner, SC 29461   (Berkeley County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $8,725,075 [brand] Estimate
Plans Available from Civil Engineer - 11/16/22
Owner View project details and contacts
Architect View project details and contacts
Description

SC File NO(S).: 0862781 PCN: P040343 Project No.: P040343 Approx. Length (miles): 19.7300 CO(S).: Berkeley Cement modified recycled base, Hot Mix Asphalt, full depth patching, concrete sidewalk, guardrail, pavement markings The Contractor's attention is called to the requirements of the SC Department of Transportation for Prequalification. Only contractors who have been issued a prequalification certificate by the sc department of transportation will be allowed to submit bids. Information concerning prequalification can be obtained at the Contracts Administration office, Room 332 in the Headquarters building, 955 Park Street, Columbia, SC, or by contacting Maria Devito at (803)737-2043 or Prequal@scdot.org. Unless otherwise indicated in the advertisement, no proposal will be considered unless accompanied by a bid bond in the amount of 5% of the Approximate bid amount, written by a surety satisfactory to the Department, properly executed in South Carolina Department of Transportation Form 674 (furnished by the Department in each proposal). If an electronic bond is utilized, the Bond ID number must be provided on the Surety 2000 or SurePath Network electronic bond form. No other form of proposal guaranty will be accepted. Visitors are welcome and should sign in at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1249 with all Letting related questions. The south carolina department of transportation reserves the right to reject any or all proposals and waive any technicalities. SCDOT - 030 - Rehabilitation Berkeley County Completion Date for this project is September 30,2024.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents