Similar Projects
Replace/Repair Roofing Systems
Alteration
Design
$219,200 est. value

2023 Capital Improvements - Bid Release 01 - Trade Package 07A - Roofing
Renovation
Sub-Bidding
$70,000 CJ est. value
Glen Ellyn, IL 60137

Saint James Farm Roof Replacement
Post-Bid
IL

Roof Replacement at Building E and G
Alteration
Post-Bid
Glen Ellyn, IL

Administrative Headquarters Roof Replacement
Results
Wheaton, IL

York Community HS Reroofing
Results
Elmhurst, IL 60126

Roof Replacement
Alteration
Post-Bid
Woodridge, IL

Family Recreation Center Roof Replacement
Results
Oak Brook, IL

Replace/Repair Roofing Systems at Multiple Sites
Alteration
Post-Bid
Less than $250,000 est. value

DuPage Airport Building Re-Roofing
Alteration
Results
West Chicago, IL 60185

2022 Gym RTU Replacement & Natatorium Ventilation Improvements
Alteration
Post-Bid
West Chicago, IL 60185

Stacy's Tavern Cedar Roof Removal and Replacement
Alteration
Results
Glen Ellyn, IL 60137

Station 31 Roof Repair/Replace
Alteration
Post-Bid
Winfield, IL 60190

Tennis Center Roof Repair
Alteration
Results
Oak Brook, IL 60523

Butler Jr High Gym Roof and Painting
Alteration
Post-Bid
Oak Brook, IL 60523

Last Updated 12/28/2022 01:03 PM
Project Title

2023 Roofing Improvements

Physical Address View project details and contacts
City, State (County) Darien, IL 60561   (DuPage County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,846,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond, Certified Check or Bank Draft in an amount equal to and not less than ten percent (10%) of the bid and made payable Board of Education, Darien Public Schools District #61, Darien, IL. No bid shall be withdrawn for a period of sixty (60) days after the bid opening date without the consent of the Owner. Checks or drafts of unsuccessful Bidders will be returned as soon as practi- cal, after opening and checking the bids. Successful Bidder must provide a Performance Bond and a Labor and Ma- terial Payment Bond in the full amount of the Contract, acceptable to the Owner The Board of Education reserves the right to reject any or all bids or parts thereof or waive any irregularities or in- formalities in bidding. This Contract is subject to the Illinois Prevailing Wage Act (820 ILCS 130/1 et seq.). QUALIFICATION: Each Bidder must satisfactorily complete the qualification process described in Section 004395 -General Requirements of the Project Manual, by providing the required Qualification Documents. The required Qualification Documents must be delivered along with the Bidder's sealed bid at the same place and time required for the bid. Tentative Commencement of Work on Site: Spring Break March 24, 2023 - April 2, 2023 & Summer June 5, 2023 The Project consists of roofing improvements at multiple schools listed below for Darien Public Schools District #61, 7414 S. Cass Avenue, Darien, IL, 1Eisenhower Junior High School, 1410 75th Street, Darien, IL 60561 2. Mark DeLay School, 6801 Wilmette Avenue, Darien, IL 60561 B. Scope: Demolition of existing roof assemblies and new fluid applied roof membranes and assemblies with related work.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents